HUBBLE SPACE TELESCOPE DAILY REPORT #2922 PERIOD COVERED: 0000Z (UTC) 07/25/01 - 0000Z (UTC) 07/26/01 Daily Status Report as of 207/0000Z 1.0 OBSERVATIONS SCHEDULED AND ACCOMPLISHED: 1.1 Completed Two Sets of STIS/CCD 8864 (CCD Dark Monitor-Part 2) The Space Telescope Imaging Spectrograph (CCD) was used to monitor the darks for the CCD. The proposal completed nominally. 1.2 Completed Four Sets of WF/PC-2 8828 (Cycle 9 Supplemental Darks pt3/3) The WF/PC-2 was used to obtain three dark frames every day to provide data for monitoring and characterizing the evolution of hot pixels. The proposal completed with no reported problems. 1.3 Completed Fourteen Sets of STIS/CCD 8808 (POMS Test Proposal: STIS Non-Scripted Parallel Proposal Continuation III) The Space Telescope Imaging Spectrograph (CCD) was used to make non-scripted, parallel observations as part of a POMS test proposal. The observations completed with no anomalous activity. 1.4 Completed Nine Sets of FGS/1 9169 (An Interferometric Harvest of Double Degenerates) Fine Guidance Sensor #1 was used to observe the white dwarf mass and age distributions that hold clues to the star formation history of our Galaxy and the age of the disk. No problems were reported. 1.5 Completed Ten Sets of WF/PC-2 9244 (POMS Test Proposal: WFII Parallel Archive Proposal Continuation) The WF/PC-2 was used to perform a generic target version of the Archival Pure Parallel program. The program will be used to take parallel images of random areas of the sky, following the recommendations of the Parallels Working Group. The observations completed with no anomalous activity. 1.6 Completed STIS/CCD 8865 (Bias Monitor-Part 2) The Space Telescope Imaging Spectrograph (CCD) was used to monitor the bias in the 1x1, 1x2, 2x1, and 2x2 bin settings at gain=1, and 1x1 at gain = 4, to build up high-S/N superbiases and track the evolution of hot columns. The proposal completed with no anomalous activity. 1.7 Completed WF/PC-2 9160 (Disks and Envelopes of Nearby Nebulous Young Stellar Objects: A Snapshot Survey) The WF/PC-2 was used to perform a snapshot survey of nearby nebulous young stellar objects to study the detailed morphology of the their disks and envelopes and probe the effect of inclination on the infrared spectral energy distribution of disk/envelope systems. The proposal completed as planned. 1.8 Completed FGS/1 9168 (The Distances to AM CVn Stars) Fine Guidance Sensor (FGS) #1 was used to determine the parallaxes and proper motions of the five brightest of the seven known AM CVn systems. AM CVn systems are binaries where mass is transferred from a completely hydrogen-deficient, degenerate mass donor to a white dwarf primary through a helium accretion disk. A better understanding of these systems is crucial for a number of reasons: (1) to study the late stages of binary evolution, (2) to study the effect of chemical composition on the physics of accretion discs, (3) to estimate their contribution to the Supernovae Ia rate, and (4) to estimate their contribution to the gravitational radiation background. All observations completed with no reported problems. 1.9 Completed Two Sets of TIS/CCD 9066 (Closing in on the Hydrogen Reionization Edge of the Universe) The Space Telescope Imaging Spectrograph (CCD) was used in parallel constrain the Hydrogen reionization edge in emission that marks the transition from a neutral to a fully ionized IGM at a predicted redshifts. The proposal completed uneventfully. 1.10 Completed WF/PC-2/STIS/CCD 8559 (The Role of Dark Matter in Cluster Formation and Galaxy Evolution) The WF/PC-2 and the Space Telescope Imaging Spectrograph (CCD) were used to observe the outer regions of massive clusters that represent transitional areas of great cosmological importance where field galaxies encounter the steep potential wells of dark matter and baryonic hot gas. Little is known about either the dark matter profile at large radii or the morphological properties of infalling galaxies at those redshifts where strong evolution is observed in the cluster cores. The proposal completed normally, with no reported problems. 1.11 Completed STIS/MA1 8843 (Cycle 9 MAMA Dark Measurements) The Space Telescope Imaging Spectrograph (MA1) was used to perform the routine monitoring of the MAMA detector dark noise. The proposal completed nominally. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: Scheduled Acquisitions: 15 Successful: 15 Scheduled Re-acquisitions: 2 Successful: 2 2.2 FHST Updates: Scheduled: 34 Successful: 34 2.3 Operations Notes: Using ROP DF-18A, the 486 engineering status buffer limits were adjusted twice. The SSR EDAC error counter was cleared three times per ROP SR-1A. The flight operations team remained at the STScI but real-time operations transferred to CCS string "G" in preparation for GSFC Internal Simulation #11 (EVA-5). 3.0 SIGNIFICANT FORTHCOMING EVENTS: GSFC Internal Simulation #11 (EVA-5) will be conducted today for approximately nine-and-one-half hours beginning at 8:00 a.m. Continuation of normal science observations and calibrations. /CAW