HUBBLE SPACE TELESCOPE DAILY REPORT #2998 PERIOD COVERED: 0000Z (UTC) 11/14/01 - 0000Z (UTC) 11/15/01 Daily Status Report as of 319/0000Z 1.0 OBSERVATIONS SCHEDULED AND ACCOMPLISHED: 1.1 Completed Two Sets of WF/PC-2 9042 (An Archive To Detect The Progenitors Of Massive, Core-Collapse Supernovae) The WF/PC-2 was used to search for supernovae which have massive star progenitors. The already extensive HST archive and high-resolution ground-based images of galaxies within ~20 Mpc enables us to resolve and quantify their individual bright stellar content. As massive, evolved stars are the most luminous single objects in a galaxy, the progenitors of core-collapse supernovae should be directly detectable on pre-explosion images. One Type II progenitor has been observed this year, and the investigators have proposed a short, companion WFPC2 proposal to confirm this candidate and identify a second. The observations completed nominally. 1.2 Completed Seven Sets of STIS/CCD 9285 (POMS Test Proposal: STIS Non-scripted Parallel Proposal Continuation III) The Space Telescope Imaging Spectrograph (CCD) was used to make low galactic latitude, non-scripted parallel observations as part of a POMS test proposal. The observations were completed as planned, and no anomalies were reported. 1.3 Completed Two Sets of WF/PC-2 8936 (Cycle 10 Supplemental Darks Pt1/3) The WF/PC-2 was used to perform a dark calibration program that obtains three dark frames every day to provide data for monitoring and characterizing the evolution of hot pixels. The proposal completed with no reported problems. 1.4 Completed Two Sets of STIS/CCD 8901 (Dark Monitor-Part 1) The Space Telescope Imaging Spectrograph (CCD) was used to monitor the darks. There was no anomalous activity. 1.5 Completed WF/PC-2 9080 (Transition from Non-radiative to Radiative Shocks in the Cygnus Loop) The WF/PC-2 was used to obtain narrow band HAlpha and O III imaging of faint filaments in the northeastern Cygnus Loop that represent the location of the primary shock front as it first encounters the ISM. There were no reported problems. 1.6 Completed Eight Sets of WF/PC-2 8941 (Cycle 10 UV Earthflats) The WF/PC-2 was used to monitor flat field stability by obtaining sequences of earth streak flats to improve the quality of pipeline flat fields for the WFPC2 UV filter set. The proposal had no problems. 1.7 Completed STIS/CCD/MA1/MA2 9153 (The Black Hole {?} in BG Gem) The Space Telescope Imaging Spectrograph (CCD, MA1 and MA2) was used to acquire low resolution ultraviolet spectra of the long period black hole binary candidate BG Geminorum. These spectra allow an unambiguous test of the nature of the 4.5 M{sun} primary star, which makes no measurable contribution to the optical spectrum. Detection of a strong ultraviolet continuum or ultraviolet absorption lines from Si II and Si III {among others} would indicate a B-type primary; failure to detect these features or detection of high ionization emission lines would favor a black hole primary. If it contains a black hole, BG Gem would be the longest period black hole binary known {by a factor of ten}, challenging current theories of black hole formation. It would also be the only eclipsing binary known to contain a black hole, which would provide a unique laboratory for testing accretion disk models for black hole binary systems. The proposal completed as planned. 1.8 Completed WF/PC-2 9244 (POMS Test Proposal: WFII Parallel Archive Proposal Continuation) The WF/PC-2 was used to perform a generic target version of the Archival Pure Parallel program. The program will be used to take parallel images of random areas of the sky, following the recommendations of the Parallels Working Group. The observations completed with no anomalous activity. 1.9 Completed Two Sets of STIS/MA1/MA2 8920 (Cycle 10 MAMA Dark Measurements) The Space Telescope Imaging Spectrograph (MA1 and MA2) was used to perform the routine monitoring of the MAMA detector dark noise, and is the primary means of checking on health of the MAMA detectors systems through frequent monitoring of the background count rate. The proposal completed with no reported anomalous activity. 1.10 Completed STIS/CCD 8903 (Bias Monitor - Part 1) The Space Telescope Imaging Spectrograph (CCD) was used to monitor the bias in the 1x1, 1x2, 2x1, and 2x2 bin settings at gain=1, and 1x1 at gain = 4 to build up high-S/N superbiases and track the evolution of hot columns. There were no problems. 1.11 Completed WF/PC-2 9118 (Tracing the Cosmic Expansion to z>1 with Type Ia Supernovae) The WF/PC-2 was used to observe type Ia supernovae in order to provide evidence for an accelerating universe. The case for cosmic acceleration rests almost entirely on the observation that the observed SN Ia at z~0.5 are 0.25 magnitudes fainter than expected for a non-accelerating Universe. It is proposed to follow five SN Ia in the range 0.95 0 cosmology, this experiment is a powerful and straightforward way to assess the reliability of the SN Ia measurements. In addition, if SN Ia are reliable standard candles, the proposed observations will significantly increase the precision with which Omega_Lambda and Omega_M are measured. There was no reported anomalous activity. 1.12 Completed WF/PC-2 8942 (Cycle 10 Intflat Sweeps and Linearity Test) The WF/PC-2 was used to monitor the pixel-to-pixel flatfield response and provide a linearity check. These intflat sequences are done once during the year and the images will provide a backup database in the event of complete failure of the visflat lamp as well as allow monitoring of the gain ratios. There were no reported problems. 1.13 Completed Two Sets of STIS/CCD 8910 (Sparse Field CTE Test-Internal {Cycle 10}) The Space Telescope Imaging Spectrograph (CCD) was used to perform CTE measurements that are made using the "sparse field test", along both the serial and parallel axes. This program needs special commanding to provide {a} off-center MSM positionings of some slits, and {b} the ability to read out with any amplifier {A, B, C, or D}. No problems were encountered. 1.14 Completed STIS/CCD 9110 (A Search for Kuiper Belt Object Satellites) The Space Telescope Imaging Spectrograph (CCD) was used to investigate whether the large number of collisions thought to have taken place in the primordial Kuiper belt suggest that many Kuiper belt objects {KBOs} could have suffered binary-forming collisions similar to that which formed the Pluto -- Charon binary. Detection of such KBO satellites would allow measurement of KBO masses, would help to understand the past collisional environment of the Kuiper belt, and would give a context to the otherwise unique-seeming formation of the Pluto -- Charon binary. The proposal completed with no reported problems. 1.15 Completed STIS/CCD 9066 (Closing in on the Hydrogen Reionization Edge of the Universe) The Space Telescope Imaging Spectrograph (CCD) was used in parallel constrain the Hydrogen reionization edge in emission that marks the transition from a neutral to a fully ionized IGM at a predicted redshifts. The proposal completed uneventfully. 1.16 Completed WF/PC-2 9173 (The Pattern of Heavy Element Abundances in a Damped LyAlpha Galaxy) The WF/PC-2 was used to observe the quasar PKS 1127-143. X-ray absorption associated with an intervening 21-cm and damped LyAlpha$ absorber at z=0.312 in its spectrum has been detected with Chandra. The advantage of the X- ray measurement is that the derived metallicity is insensitive to ionization, inclusion of an atom in a molecule, or depletion onto grains. The X-ray absorption is mostly due to oxygen, and the abundance agrees with the oxygen abundance of 16-40 lines in a galaxy at the redshift of the absorber. The STIS spectrum will allow measurement of Zn II, an undepleted iron peak element. Comparison of the oxygen group measured in the X-rays with the iron peak nuclei measured will reveal whether the absorber has a Pop II, halo-type abundance pattern or a Pop I, disk-like abundance pattern. The proposla completed with no reported anomalous activity. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: Scheduled Acquisitions: 9 Successful: 9 Scheduled Re-acquisitions: 4 Successful: 4 2.2 FHST Updates: Scheduled: 22 Successful: 22 2.3 Operations Notes: The SSR EDAC error counter was cleared at 318/1243Z per ROP SR-1A. 3.0 SIGNIFICANT FORTHCOMING EVENTS: GSFC Internal Simulation #12 (Deploy) will be conducted in the STOCC area today from 8 a.m. to approximately 4 p.m. Continuation of normal science observations and calibrations. /CAW