HUBBLE SPACE TELESCOPE DAILY REPORT #1326 PERIOD COVERED: 0000Z (UTC) 02/13/95 - 0000Z (UTC) 02/14/95 Daily Status Report as of 045/0000Z 1.0 ACTIVITIES SCHEDULED AND ACCOMPLISHED: 1.1 Completed Two Sets of WF/PC-2 5313 (Characterization of Jupiter's Vertical Cloud Structure ) The WF/PC-2 was used to make observations of the planet Jupiter. The goal is to understand the general meteorology of Jupiter's visible atmosphere and the nature of the transport processes that occur within it. The observations were executed as scheduled, and no anomalies were noted. 1.2 Completed Three Sets of WF/PC-2 5574 (WF/PC-2 Cycle 4: Polarization Proposal) The WF/PC-2 was used to make observations of G191B2B to obtain both polarized and unpolarized images of the target to calibrate the instrument. Visual flat observations was also taken. The observations were completed as planned, and no anomalies were reported. 1.3 Completed FOS/RD 5451 (The Absorption Cross-sections of Nearby Galaxies) The Faint Object Spectrograph (Red Side) was used to observe light from quasi-stellar object 1219+047, which acts as a probe as it passes the outer reaches of a nearby galaxy. The observations were completed as planned, and no anomalies were reported. 1.4 Completed WF/PC-2 5369 (HST Medium-Deep Survey: Cycle 4 Medium, High Galactic Latitude) The WF/PC-2 made a series of observations of high latitude objects as part of a medium deep sky survey. The observations were taken in parallel with other prime science observations. The observations were completed as scheduled, and no anomalies were noted. 1.5 Completed WF/PC-2 5563 (WF/PC-2 Cycle 4 Photometric Calibration Monitor 1: UV /OPT STD.) The WF/PC-2 was used to make photometric calibration images of ultraviolet standard star GRW+70D582 and monitor the photometric stability and quantum efficiency of the WF/PC-2. The observations were executed as scheduled, and no anomalies were noted. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: Scheduled Acquisitions : 4 Successful : 4 Scheduled Reacquisitions : 11 Successful : 11 2.2 FHST Updates: Scheduled : 10 Successful : 10 2.3 Significant HSTARs: None 2.4 Operations Notes: The RMGA power cycle was executed yesterday. Today, the three day Battery #5 capacity test will begin. 3.0 ANOMALY STATUS: 3.1 Significant New Anomalies: None 3.2 Significant Unresolved Anomalies: None 4.0 SIGNIFICANT FORTHCOMING EVENTS: Nothing at this time. /DMH -END-