HUBBLE SPACE TELESCOPE DAILY REPORT #1418 PERIOD COVERED: 0000Z (UTC) 06/22/95 - 0000Z (UTC) 06/23/95 Daily Status Report as of 174/0000Z 1.0 ACTIVITIES SCHEDULED AND ACCOMPLISHED: 1.1 Completed FOS/BL 6146 (FOS Location of Spectra and Aperture - Part 2) The Faint Object Spectrograph (Blue Side) was used to conduct a test to determine the repeatability of positioning the filter-grating wheel. All observations were internal. A wave length calibration image and a Taled calibration observation were also taken. All observations were executed as scheduled, and no anomalies were noted. 1.2 Completed WF/PC-2 6228 (Young Globular Clusters in Interacting and Cooling Flow Galaxies) The WF/PC-2 was used to make observations of galaxy cluster Abell-2029 looking for young globular clusters. Very deep exposures were made of the target to attempt to distinguish between its two possible formation histories. The observations were executed as scheduled, and no anomalies were reported. 1.3 Completed WF/PC-2 5463 (Buried QSOs in IRAS-Selected Ultra luminous AGNs) The WF/PC-2 was used to make observations of the luminous IRAS active galactic nuclei of galaxy IRAS2306+0 to try to resolve the polarized scattering regions in its core. The observations were completed as planned, and no anomalies were reported. 1.4 Completed GHRS/2 5837 (Ultraviolet Imaging and Spectroscopy of the Icy Galilean Satellites) The GHRS/2 was used to make ultraviolet observations of Jupiter's moon Europa to study the albedo features caused by SO2 absorption. These observations will be coordinated with the IUE spacecraft and other ground based observations. The observations were completed as planned, and no anomalies were reported. 1.5 Completed WF/PC-2 6058 (Direct Imaging of a Circumstellar Disk: Beta Pictoris) The WF/PC-2 was used to make observations of the circumstellar disk on the star Beta Pictoris (aka, HD39060) in order to study the brightness profile of the disk. The observations were completed as scheduled, and no anomalies were noted. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: Scheduled Acquisitions : 5 Successful : 5 Scheduled Reacquisitions : 5 Successful : 5 2.2 FHST Updates: Scheduled : 14 Successful : 14 2.3 Significant HSTARs: None 2.4 Operations Notes: There were no reported operational problems. 3.0 SIGNIFICANT FORTHCOMING EVENTS: Nothing at this time. /DMH -END-