HUBBLE SPACE TELESCOPE DAILY REPORT #1562 PERIOD COVERED: 0000Z (UTC) 02/01/96 - 0000Z (UTC) 02/02/96 Daily Status Report as of 033/0000Z 1.0 ACTIVITIES SCHEDULED AND ACCOMPLISHED: 1.1 Completed FOS/RD 6167 (FOS Cycle 5: Dark Monitoring) The Faint Object Spectrograph (Red Side) was used to make several = dark calibration images. All exposures were internals. All spectra was = done in the image mode. The observations were completed as planned, and = no problems were reported. 1.2 Completed WF/PC-2 6129 (The Structure, Polarization, and Evolution = of the Crab Synchrotron Nebula) The WF/PC-2 was used to make observations of the area near = Crab-Pulsar (M-1) in order to study its structure, polarization, and = evolution. Two color and polarization images were made. A dark = calibration image was also taken. The observations were executed as = planned, and no anomalies were reported. 1.3 Completed WF/PC-2 6344 (Low - Mass Binaries in the Hyades - = Completing the Survey) The WF/PC-2 was used to make observations of the low mass binary = star RHY399 (M-Class Dwarf Stars) which is located in the Hyades Cluster. = The observations were executed as scheduled, and no anomalies were noted. 1.4 Completed GHRS/1 6018 (Reading the "Rosetta Stone": GHRS = Spectroscopy of Individual Stars) The High Resolution Spectrograph (Side One) was used to make = observations of individual stars (i.e., Melnick-34, et al) located in = R136A which in turn is located in the Large Magellanic cloud. The goal is = to obtain a better understanding of the evolution of very massive stars. = The observations were executed as scheduled, and no anomalies were noted. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: Scheduled Acquisitions : 3 Successful : 3 Scheduled Reacquisitions : 4 Successful : 4 2.2 FHST Updates: Scheduled : 6 Successful : 6 2.3 Operations Notes: ESTR #2 is powered off pending completion of the investigation of = the high motor current anomaly. 3.0 SIGNIFICANT FORTHCOMING EVENTS: Nothing at this time. /DMH