HUBBLE SPACE TELESCOPE DAILY REPORT #1751 PERIOD COVERED: 0000Z (UTC) 10/31/96 - 0000Z (UTC) 11/01/96 Daily Status Report as of 306/0000Z 1.0 ACTIVITIES SCHEDULED: The following scheduled proposals did not execute due to the on-going = safemode event: 1. Three Sets of WF/PC-2 6253 (Pure Parallel Archive Program) 2. GHRS/2 6455 (Metal Diffusion and Radiative Levitation in Hot Helium Rich White Dwarfs) 3. WF/PC-2 6361 (High Resolution Imaging of X-Ray Selected AGNs) 4. WF/PC-2 6905 (WF/PC-2 Cycle 6 Calibration: Internal Monitor) 5. WF/PC-2 6348 (Blue Continuum Snapshots of 3CR Radio Galaxies) 6. GHRS/1 7208 (Spectroscopic Imaging of the Jovian Aurora) 7. WF/PC-2 6756 (Measuring Proper Motions of Galactic Microlenses) 8. GHRS/2 6501 (Probing the Equatorial Ejecta of Eta Carinae) 9. GHRS/1 6445 (A Hyades Enigma: 71 Tauri) 2.1 Guide Star Acquisitions: Scheduled Acquisitions : 0 Successful : 0 Scheduled Reacquisitions : 0 Successful : 0 2.2 FHST Updates: Scheduled : 0 Successful : 0 2.3 Operations Notes: Due to the problems with RWA #1 experienced at 304/18101Z, a = Health and Safety Load using a three-RWA configuration was prepared and = uplinked at 305/0029Z. All spacecraft subsystems continue in a healthy = state. A Test Readiness Review will be held this morning for a turn-on of = RWA #1 for an assessment of its capabilities. Depending on the results = of the test, plans will immediate begin to return HST to science = opertions. If it is determined that RWA #1 is no longer usable, the = three-RWA configuration will be the normal mode of operation. Future = science SMSs will then be constructed with this new reality being = factored into their development. 3.0 SIGNIFICANT FORTHCOMING EVENTS: Nothing at this time. /DMH