HUBBLE SPACE TELESCOPE DAILY REPORT #1753 PERIOD COVERED: 0000Z (UTC) 11/04/96 - 0000Z (UTC) 11/05/96 Daily Status Report as of 310/0000Z 1.0 ACTIVITIES SCHEDULED AND ACCOMPLISHED: The following scheduled proposals did not execute due to the on-going = safemode event: 1.1 WF/PC-2 6366 (The Early Onset of Asymmetric Outflow During the = Planetary Nebula formation) 1.2 WF/PC-2 6194 (WF/PC-2 Cycle 5: Polarization Proposal) 1.3 WF/PC-2 6909 (WF/PC-2 Cycle 6 Calibration: Earth Flats) 1.4 FOC/96 6931 (Exploratory Focus Monitoring Test) 1.5 FGS 6884 (Companion to W922) 1.6 Three Sets of WF/PC-2 6253 (Pure Parallel Archive Program) 1.7 Three Sets of WF/PC-2 6188 (WF/PC-2 Cycle 5 Calibration: Dark) 1.8 WF/PC-2 6720 (The Evolution of Radio Loud Quasars II) 1.9 GHRS/2 6615 (Fundamental Parameters of White Dwarfs in Close = Binaries) 1.10 Two sets of FOS/BL 6407 (Post Asymptotic Giant Branch Evolution = in the Magellanic Clouds) 1.11 WF/PC-2 6519 (Parallel High Resolution Imaging of Defuse Objects = in the Magellanic Clouds) 1.12 GHRS/1 6638 (Physics of Defuse Clouds in the Local Bubble, Part = 1) 1.13 FOS/RD 6719 (The Gaseous Environment of the Ursa Minor Dwarf = Spheroidal Galaxy) 1.14 WF/PC-2 7202 (The WF/PC-2 B Band Parallel Survey: A Systematic = and Synoptic Study of Galaxy Formation and Evolution - Short Orbit Case) 2.1 Guide Star Acquisitions: Scheduled Acquisitions : 0 Successful : 0 Scheduled Reacquisitions : 0 Successful : 0 2.2 FHST Updates: Scheduled : 0 Successful : 0 2.3 Operations Notes: The Health and Safety Load (i.e., HS310) starts at 310/0500Z and plans to = run until 311/1922Z. At that time the SMS (i.e., SMS-SA311G00) will start = at 311/1923Z and run through 315/2359Z. Real-time operations moved to SAMS due to the JIS#6 simulation. 3.0 SIGNIFICANT FORTHCOMING EVENTS: The return to normal HST science observations is expected at Wednesday, = Nov 06, 1996, 311/1923Z. The JIS#6 Simulation (EVA #3) will start today at 10AM EST and run = through 830 PM EST. /DMH