HUBBLE SPACE TELESCOPE DAILY REPORT #1755 PERIOD COVERED: 0000Z (UTC) 11/06/96 - 0000Z (UTC) 11/07/96 Daily Status Report as of 312/0000Z 1.0 ACTIVITIES SCHEDULED AND ACCOMPLISHED: The following scheduled proposals did not execute due to the on-going = safemode event: 1.1 WF/PC-2 6346 (Snapshot Survey of the Ultraluminous IRAS Galaxy Sample-Part 1 High) 1.2 FGS 6486 (Orbits of Pre-Main Sequence Binaries) 1.3 WF/PC-2 6253 (Pure Parallel Archive Program) 1.4 FOS RD 6487 (Spectroscopy of the Inner Satellites of Uranus) 1.5 FOS/BL 6407 (Post Asymptotic Giant Branch Evolution in the Magellanic Clouds) 1.6 Completed WF/PC-2 6905 (WF/PC-2 Cycle 6 Calibration: Internal Monitor) 1.7 Completed GHRS/1/2 6415 (Thermal Pressures of the Local Interstellar Medium) 1.8 Completed WF/PC-2 6344 (Low - Mass Binaries in the Hyades - Completing the Survey) *********************** The HST science observations resumed on Wednesday, November 06, 1996, = at 311/1923Z. 1.1 Completed GHRS/1/FOS/RD 6784 (Ultraviolet Spectrum Templates from = Metal-Rich Open Cluster NGC-6791) Both the High Resolution Spectrograph (Side One) and the Faint = Object Spectrograph (Red Side) were used to make ultraviolet = spectrographic template observations of the metal -rich, open cluster = NGC-6791. This open cluster is a potential Rosetta Stone for decoding = the properties of metal-rich stars. During this proposal, the loss of = lock described in 2.1 occurred. Otherwise, the observations were = completed as planned with no further problems being reported. 2.1 Guide Star Acquisitions: Scheduled Acquisitions : 2 Successful : 2 Scheduled Reacquisitions : 9 Successful : 9 A loss of lock occurred at 311/222835Z and continued until the end = of the acquisition at 311/225825Z. The events surrounding this event are = described in HSTAR 5790. 2.2 FHST Updates: Scheduled : 5 Successful : 5 2.3 Operations Notes: Normal science observations, begun again at approximately = 311/1923Z, are continuing. 3.0 SIGNIFICANT FORTHCOMING EVENTS: Nothing at this time. /DMH