HUBBLE SPACE TELESCOPE DAILY REPORT #2433 PERIOD COVERED: 0000Z (UTC) 08/10/99 - 0000Z (UTC) 08/11/99 Daily Status Report as of 223/0000Z 1.0 ACTIVITIES SCHEDULED AND ACCOMPLISHED: 1.1 Completed STIS/CCD 8271 (A Snapshot Survey of LMC Planetary Nebulae: A Study of Nebular and Late Stellar Evolution) The Space Telescope Imaging Spectrograph (CCD) was used to make medium-resolution slitless spectroscopy snapshot images of the planetary nebulae LMC-SMP-81 located in the Large Magellanic Cloud to study the parallel evolution of the nebulae and its central star. The observations were completed as planned, and no problems were reported. 1.2 Completed STIS/CCD 8408 (STIS CCD Dark Monitor C8) The Space Telescope Imaging Spectrograph (CCD) was used to make a CCD bias calibration observation. This is to monitor the darks for the STIS CCD. The observations were executed as scheduled, and no anomalies were reported. 1.3 Completed STIS/CCD 8409 (STIS CCD Bias Monitor C8) The Space Telescope Imaging Spectrograph (CCD) was used to make a CCD bias calibration observation. This is to monitor the bias in the 1x1, 1x2, 2x1, and 2x2 bin settings at gain=1, and 1x1 at gain = 4, to build up high-S/N superbiases and to track the evolution of hot columns. The observations were executed as scheduled, and no anomalies were reported. 1.4 Completed Three Sets of STIS/CCD 8202 (Bright Quasar Close Lensing Search) The Space Telescope Imaging Spectrograph (CCD) was used to make observations of HCLQ1643+3, HCLQ0138-3 and HCLQ1459+3 as part of a second generation survey to search for bright lensing quasars. With the restored PSF, new images will be considerably more sensitive to the presence of both close separation and faint lens components, and because STIS reaches two magnitudes fainter the PC, the new snapshot images will have much greater dynamic range. The observations were executed as scheduled, and no anomalies were noted. 1.5 Completed Three Sets of STIS/CCD 8406 (POMS Test Proposal: STIS Non-Scripted Parallel Proposal Continuation V) The Space Telescope Imaging Spectrograph (CCD) was used to make high galactic latitude observations taken in parallel with the prime science observations as part of a POMS proposal. This is a STIS non-scripted parallel Condition V proposal. The observations were completed as scheduled, and no anomalies were reported. 1.6 Completed Three Sets of WF/PC-2 8441 (WF/PC-2 Decontaminations and Associated Observations Pt. 1/2) The WF/PC-2 was used to make its monthly decontamination operations. Observations were made of standard star GRW+70D582. Also included are instrument monitors tied to decons: photometric stability check, focus monitor, pre- and post-decon internals {bias, internal flats, k-spots, and darks}, and ultraviolet throughput checks. The observations were executed as scheduled, and no anomalies were noted. 1.7 Completed WF/PC-2 6788 (The Main Sequence Luminosity Function of Palomar 5) The WF/PC-2 was used to make observations of Palomar5 in order to study its main sequence luminosity function. Palomar 5 appears to represent an extreme in the dynamical evolution of globular clusters. The observations were executed as scheduled, and no anomalies were noted. 1.8 Completed STIS/MA1/MA2 8426 (Cycle 8 MAMA Dark Measurements) The Space Telescope Imaging Spectrograph (MA1 and MA2) was used to make a routine Cycle-8 MAMA dark noise calibration measurement. This proposal will provide the primary means of checking on the health of the MAMA detectors. This is done through frequent monitoring of the background count rate. The observations were completed as planned, and no problems were reported. 1.9 Completed STIS/MA2 8275 (Ultraviolet Snapshots of 3CR Radio Source Counterparts at Low Z) The Space Telescope Imaging Spectrograph (MA2) was used to make ultraviolet snapshot observations of the radio galaxy 3C390.0. Radio galaxies are an important class of extragalactic objects, representing one of the most energetic astrophysical phenomena, while extraordinarily useful as probes of their environments and of the early Universe. The observations were completed as scheduled, and no anomalies were reported. 1.10 Completed WF/PC-2 8090 (POMS Test Proposal: WF-II Parallel Archive Proposal Continuation) The WF/PC-2 was used in the parallel mode to make some low galactic latitude archive observations. The program will be used to take parallel images of random areas of the sky. The observations were executed as scheduled, and no anomalies were noted. 1.11 Completed STIS/CCD 7438 (Spatially-Resolved Spectroscopy of the UVX in Elliptical Galaxies) The Space Telescope Imaging Spectrograph (CCD) was used to make spatially resolved far-ultraviolet observations of the large elliptical galaxy NGC-221. The prominent far-UV upturn {UVX} in the spectra of elliptical galaxies originates from stars in their old populations which have evolved beyond the He-flash at the tip of the red giant branch. A wavelength calibration image was also taken. The observations were completed as scheduled, and no anomalies were reported. 1.12 Completed WF/PC-2 8059 (POMS Test Proposal: WF-2 Targeted Parallel Archive Proposal) The WF/PC-2 was used to make observations in parallel with the prime science observations. The parallel opportunities available with WF/PC-2 in the neighborhood of bright galaxies are treated in a slightly different way from the normal pure parallels. Local group galaxies offer the opportunity for a closer look at young stellar populations. The observations were completed as planned, and no anomalies were reported. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: Scheduled Acquisitions: 9 Successful: 9 Scheduled Reacquisitions: 7 Successful: 7 2.2 FHST Updates: Scheduled: 24 Successful: 23 The update scheduled for 223/021301Z failed. 2.3 Operations Notes: The Flight Operations Team returned to the STOCC area at 222/2215Z from the SAMS back-up facility upon the conclusion of Joint Integrated Simulation #4. Using ROP SR-1, the SSR EDAC error counter was cleared three times. The NICMOS FPA temperature sensor for detector 1 was enabled at 223/0512; for detector 3, at 223/0619Z. The first portion of the Lunar/Solar Eclipse Procedure (ROP PS-2) has been executed in preparation for the solar eclipse expected between 223/1351Z and 223/1428Z. 3.0 SIGNIFICANT FORTHCOMING EVENTS: Continuation of normal science observations and calibrations. /DMH