HUBBLE SPACE TELESCOPE DAILY REPORT #2512 PERIOD COVERED: 0000Z (UTC) 12/02/99 - 0000Z (UTC) 12/03/99 Daily Status Report as of 337/0000Z 1.0 OBSERVATIONS SCHEDULED AND ACCOMPLISHED: Since HST remains in Zero Gyro Sun Point (ZGSP), no science observations were performed. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: No activity 2.2 FHST Updates: No activity 2.3 Operations Notes: The HST remains in ZGSP. Using ROP NS-3, the NSSC-1 status buffer was dumped at 336/1505Z. Upon the conclusion of the ZGSP/RMGA simulation, the flight operations team returned to the STOCC area at 337/0015Z, remaining on the CCS "G" string. Operations was transferred to the CCS "A" string at 337/0248Z. At the same time, the "G" string was configured for ODMs and GCMRs. 3.0 SIGNIFICANT FORTHCOMING EVENTS: The continuation of the PSEA/RMGA On-Orbit Test will occur today. Servicing Mission 3A, currently scheduled for December 11, 1999. /CAW