HUBBLE SPACE TELESCOPE DAILY REPORT #2514 PERIOD COVERED: 0000Z (UTC) 12/06/99 - 0000Z (UTC) 12/7/99 Daily Status Report as of 341/0000Z 1.0 OBSERVATIONS SCHEDULED AND ACCOMPLISHED: Since HST remains in Zero Gyro Sun Point (ZGSP), no science observations were performed. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: No activity 2.2 FHST Updates: No activity 2.3 Operations Notes: The HST continues in ZGSP. Using Operations Note #661, the time-based recharge ratio charge/discharge buffer was reset at 340/1359Z. A quick update to a FGE/EPS CCL procedure was performed at 340/2027Z. The RGA configuration TMDIAG for SM3A was modified at 340/2201Z. 3.0 SIGNIFICANT FORTHCOMING EVENTS: Servicing Mission 3A, currently scheduled for December 11, 1999. /CAW