HUBBLE SPACE TELESCOPE DAILY REPORT #2515 PERIOD COVERED: 0000Z (UTC) 12/07/99 - 0000Z (UTC) 12/08/99 Daily Status Report as of 342/0000Z 1.0 OBSERVATIONS SCHEDULED AND ACCOMPLISHED: Since HST remains in Zero Gyro Sun Point (ZGSP), no science observations were performed. 2.0 FLIGHT OPERATIONS SUMMARY: 2.1 Guide Star Acquisitions: No activity 2.2 FHST Updates: No activity 2.3 Operations Notes: The HST continues in ZGSP. Using Operations Note #661, the time-based recharge ratio charge/discharge buffer was reset at 341/1246Z. The WF/PC-2 was configured for SM3A at 341/1449Z per an operations request. At 341/1500Z, new WF/PC-2 operational limits were instituted per Operations Note #685. Per HSTAR 7397, SSR mnemonics (DSDFSUB, DSDOWFL1, DSDUEDC1, DSDCHCKE, DSDEECKF, DSDSWRST, AND DSDCEDC1) went out-of-limits. 3.0 SIGNIFICANT FORTHCOMING EVENTS: Servicing Mission 3A, currently scheduled for December 11, 1999. /CAW