STScI Logo
STScI Logo
HST
Banner
FAQ

FOC Cycle 5 Calibration Program Descriptions

Each program is described in detail, giving the following information:

  • Proposal Title and RPS2 ID number.
  • Short statement of the purpose of the program.
  • Program description.
  • Instrumental configuration used.
  • Statement of the resources required, both in orbits and FTEs.
  • Any special requirements needed to carry out the program.
  • Accuracy attainable.
  • Investigation products.

The calibration plan consisted of the following proposals [given as PostScript files]:

The final page [Postscript, 47 kb] details how the Cycle 5 program fits in the context of what was achieved in the Cycle 4 Calibration program.

Shortcuts

FOC Instrument Handbook
FOC Data Handbook
ISRs
TIPS


Copyright  | Help  | Printable Page