15551( 2) - 07-Aug-2018 17:19:00 - [ 1] HUBBLE SPACE TELESCOPE OBSERVING PROGRAM 15551 Version: 2 Check-in Time: 07-Aug-2018 17:19:00 STScI Edit Number: 0 Title STIS CCD Hot Pixel Annealing ------------------------------------------------------------------------------------ Type Cycle CAL/STIS 26 ------------------------------------------------------------------------------------ Investigators Contact? PI: Doug Branton Space Telescope Science Institute Y ------------------------------------------------------------------------------------ Abstract This purpose of this activity is to repair radiation induced hot pixel damage to the STIS CCD by warming the CCD to the ambient instrument temperature and annealing radiation damaged pixels. Radiation damage creates hot pixels in the STIS CCD Detector. Many of these hot pixels can be repaired by warming the CCD from its normal operating temperature near -83 C to the ambient instrument temperature (~ +5 C) for several hours. The number of hot pixels repaired is a function of annealing temperature. The effectiveness of the CCD hot pixel annealing process is assessed by measuring the dark current behavior before and after annealing and by searching for any window contamination effects. ------------------------------------------------------------------------------------ Observations Description ------------------------ The characteristics of the CCD will first be defined by a series of Bias, Dark and flat-field exposures. The CCD Thermoelectric cooler (TEC) will then be turned off to allow the CCD detector temperature to rise (from about -80C to +5C). The CCD will be left in the uncooled state for approximately 12 hours. At the end of this period, the TEC is turned back on and the CCD is cooled to its normal operating temperature. Since the CCD on Side-2 does not have a thermistor, at a minimum, a 3 hour period is necessary to ensure that the CCD is cool and stable. After the CCD has stabilized bias, dark and flat-field images will be repeated to check for changes in the CCD characteristics. Because the CCD window is on the CCD housing and not bonded to the chip, the window is actually warmest when the CCD is being cooled (because the TEC power warms the housing and coldest during the TEC-off annealing process). The flat field exposures will permit evaluation of any window contamination acquired during the annealing period. ------ Calibration Justification ------- This activity will allow the tracking of the creation rate of hot pixels with time. Will also allow the determination of the dark current for STIS and how the dark rate changes with time --------- Additional Comments ---------- Start the week of November 19, 2018. Continue every 4 weeks through 15551( 2) - 07-Aug-2018 17:19:00 - [ 2] October, 2019 (12 rounds of 3 visits) ------------------------------------------------------------------------------------ 15551( 2) - 07-Aug-2018 17:19:00 - [ 3] Visit: 01 Visit Requirements: BETWEEN 19-NOV-2018:00:00:00 AND 25-NOV-2018:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 4] Visit: 02 Visit Requirements: AFTER 01 BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit 1 by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 5] Visit: 03 Visit Requirements: AFTER 02 BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit 2 by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 6] Visit: 04 Visit Requirements: BETWEEN 17-DEC-2018:00:00:00 AND 23-DEC-2018:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 7] Visit: 05 Visit Requirements: AFTER 04 BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit 4 by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 8] Visit: 06 Visit Requirements: AFTER 05 BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit 5 by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 9] Visit: 07 Visit Requirements: BETWEEN 14-JAN-2019:00:00:00 AND 20-JAN-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 10] Visit: 08 Visit Requirements: AFTER 07 BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit 7 by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 11] Visit: 09 Visit Requirements: AFTER 08 BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit 8 by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 12] Visit: 0A Visit Requirements: BETWEEN 11-FEB-2019:00:00:00 AND 17-FEB-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 13] Visit: 0B Visit Requirements: AFTER 0A BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit A by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 14] Visit: 0C Visit Requirements: AFTER 0B BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit B by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 15] Visit: 0D Visit Requirements: BETWEEN 11-MAR-2019:00:00:00 AND 17-MAR-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 16] Visit: 0E Visit Requirements: AFTER 0D BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit D by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 17] Visit: 0F Visit Requirements: AFTER 0E BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit E by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 18] Visit: 0G Visit Requirements: BETWEEN 08-APR-2019:00:00:00 AND 14-APR-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 19] Visit: 0H Visit Requirements: AFTER 0G BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit G by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 20] Visit: 0I Visit Requirements: AFTER 0H BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit H by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 21] Visit: 0J Visit Requirements: BETWEEN 06-MAY-2019:00:00:00 AND 12-MAY-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 22] Visit: 0K Visit Requirements: AFTER 0J BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit J by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 23] Visit: 0L Visit Requirements: AFTER 0K BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit K by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 24] Visit: 0M Visit Requirements: BETWEEN 03-JUN-2019:00:00:00 AND 09-JUN-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 25] Visit: 0N Visit Requirements: AFTER 0M BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit M by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 26] Visit: 0O Visit Requirements: AFTER 0N BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit N by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 27] Visit: 0P Visit Requirements: BETWEEN 01-JUL-2019:00:00:00 AND 07-JUL-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 28] Visit: 0Q Visit Requirements: AFTER 0P BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit P by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 29] Visit: 0R Visit Requirements: AFTER 0Q BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit Q by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 30] Visit: 0S Visit Requirements: BETWEEN 29-JUL-2019:00:00:00 AND 04-AUG-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 31] Visit: 0T Visit Requirements: AFTER 0S BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit S by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 32] Visit: 0U Visit Requirements: AFTER 0T BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit T by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 33] Visit: 0V Visit Requirements: BETWEEN 26-AUG-2019:00:00:00 AND 01-SEP-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 34] Visit: 0W Visit Requirements: AFTER 0V BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit V by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 35] Visit: 0X Visit Requirements: AFTER 0W BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit W by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 36] Visit: 0Y Visit Requirements: BETWEEN 23-SEP-2019:00:00:00 AND 29-SEP-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 37] Visit: 0Z Visit Requirements: AFTER 0Y BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit Y by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 38] Visit: 10 Visit Requirements: AFTER 0Z BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit Z by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 39] Visit: 11 Visit Requirements: BETWEEN 21-OCT-2019:00:00:00 AND 27-OCT-2019:00:00:00 On Hold Comments: Additional Comments: This visit is before the annealing. The dark exposures must be 'dark' darks. The 3 visit structure (i.e. BEFORE, ANNEAL, AFTER) MUST be maintained for continuity and monitoring. All 3 visits to be done MONTHLY (or, more precisely, EVERY FOUR WEEKS). Should be done in parallel. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF GAIN=1, PREFLUSH=YES 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Pre-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Pre-anneal DARKS ------------------------------------------------------------------------------------------------------------------------------------ 4 NONE STIS/CCD ACCUM 50CCD MIRROR LAMP=TUNGSTEN, GAIN=4 3 0.6 S (1.8 S) Comments: Pre-anneal FLATS ------------------------------------------------------------------------------------------------------------------------------------ 5 NONE STIS/CCD ACCUM 52X2 G750M 6768 LAMP=TUNGSTEN, GAIN=1 3 0.1 S (0.3 S) Comments: Pre-anneal spectral FLATS ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 1 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 2 none 1 N/A NONE 4 STIS/CCD ACCUM 50CCD MIRROR none none 3 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 1 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 2 none 1 N/A NONE 5 STIS/CCD ACCUM 52X2 G750M 6768 none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 40] Visit: 12 Visit Requirements: AFTER 11 BY 0 H TO 36 H; PARALLEL On Hold Comments: Additional Comments: After Visit 11 by 0H to 36H Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 NONE STIS ANNEAL 1 0.0 S (0 S) Comments: Perform the standard STIS CCD annealing procedure: turn off the TEC power for 12 hours; after that time, turn the TEC power back on, with the setpoint commanded to the nominal value established in SMOV. ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ NONE 1 STIS ANNEAL none none none none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 41] Visit: 13 Visit Requirements: AFTER 12 BY 0 H TO 22 H; PARALLEL On Hold Comments: Additional Comments: AFTER Visit 12 by 0H to 22H. From the time the TEC power is turned back on following the annealing process, wait at least 3 hours before commencing exposures to allow the CCD to fully stabilize. The dark exposures must be 'dark' darks. Exposures ------------------------------------------------------------------------------------------------------------------------------------ Exp | Target | Instr | Oper. | Aper |Spectral|Central| Optional |Num| Time | Special Num | Name | Config | Mode | or FOV |Element |Waveln.| Parameters |Exp| (Total) | Requirements ------------------------------------------------------------------------------------------------------------------------------------ 1 BIAS STIS/CCD ACCUM DEF DEF PREFLUSH=YES, GAIN=1 1 0.0 S (0 S) Comments: Pre-flush BIAS ------------------------------------------------------------------------------------------------------------------------------------ 2 BIAS STIS/CCD ACCUM DEF DEF GAIN=1 3 0.0 S (0 S) Comments: Post-anneal BIAS ------------------------------------------------------------------------------------------------------------------------------------ 3 DARK STIS/CCD ACCUM DEF DEF GAIN=1 3 1100 S (3300 S) Comments: Post-anneal DARK ------------------------------------------------------------------------------------------------------------------------------------ Sub Exposures ------------------------------------------------------------------------------------------------------------------------------------ Target | Exp |Instr | Oper. | Aper |Spectral|Cent.|Primary |Secondary |Iteration |CR-SPLIT |Orbit |Duration Name | Num |Config | Mode | or FOV |Element |Wave.|Pattern Pos |Pattern Pos |Num |Num |Number | ------------------------------------------------------------------------------------------------------------------------------------ BIAS 1 STIS/CCD ACCUM DEF DEF none none none none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A BIAS 2 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 1 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 2 none 1 N/A DARK 3 STIS/CCD ACCUM DEF DEF none none 3 none 1 N/A 15551( 2) - 07-Aug-2018 17:19:00 - [ 42] Summary Form for Proposal 15551 Item Used in this proposal ------------------------------------------------------------------------------------------------------------------------------------ Apertures 50CCD, 52X2, DEF ------------------------------------------------------------------------------------------------------------------------------------ Configurations STIS, STIS/CCD ------------------------------------------------------------------------------------------------------------------------------------ Opmodes ACCUM, ANNEAL ------------------------------------------------------------------------------------------------------------------------------------ Optional Parameters GAIN=1, GAIN=4, LAMP=TUNGSTEN, PREFLUSH=YES ------------------------------------------------------------------------------------------------------------------------------------ Special Requirements AFTER 01 BY 0 H TO 36 H, AFTER 02 BY 0 H TO 22 H, AFTER 04 BY 0 H TO 36 H, AFTER 05 BY 0 H TO 22 H, AFTER 07 BY 0 H TO 36 H, AFTER 08 BY 0 H TO 22 H, AFTER 0A BY 0 H TO 36 H, AFTER 0B BY 0 H TO 22 H, AFTER 0D BY 0 H TO 36 H, AFTER 0E BY 0 H TO 22 H, AFTER 0G BY 0 H TO 36 H, AFTER 0H BY 0 H TO 22 H, AFTER 0J BY 0 H TO 36 H, AFTER 0K BY 0 H TO 22 H, AFTER 0M BY 0 H TO 36 H, AFTER 0N BY 0 H TO 22 H, AFTER 0P BY 0 H TO 36 H, AFTER 0Q BY 0 H TO 22 H, AFTER 0S BY 0 H TO 36 H, AFTER 0T BY 0 H TO 22 H, AFTER 0V BY 0 H TO 36 H, AFTER 0W BY 0 H TO 22 H, AFTER 0Y BY 0 H TO 36 H, AFTER 0Z BY 0 H TO 22 H, AFTER 11 BY 0 H TO 36 H, AFTER 12 BY 0 H TO 22 H, BETWEEN 01-JUL-2019:00:00:00 AND 07-JUL-2019:00:00:00, BETWEEN 03-JUN-2019:00:00:00 AND 09-JUN-2019:00:00:00, BETWEEN 06-MAY-2019:00:00:00 AND 12-MAY-2019:00:00:00, BETWEEN 08-APR-2019:00:00:00 AND 14-APR-2019:00:00:00, BETWEEN 11-FEB-2019:00:00:00 AND 17-FEB-2019:00:00:00, BETWEEN 11-MAR-2019:00:00:00 AND 17-MAR-2019:00:00:00, BETWEEN 14-JAN-2019:00:00:00 AND 20-JAN-2019:00:00:00, BETWEEN 17-DEC-2018:00:00:00 AND 23-DEC-2018:00:00:00, BETWEEN 19-NOV-2018:00:00:00 AND 25-NOV-2018:00:00:00, BETWEEN 21-OCT-2019:00:00:00 AND 27-OCT-2019:00:00:00, BETWEEN 23-SEP-2019:00:00:00 AND 29-SEP-2019:00:00:00, BETWEEN 26-AUG-2019:00:00:00 AND 01-SEP-2019:00:00:00, BETWEEN 29-JUL-2019:00:00:00 AND 04-AUG-2019:00:00:00, PARALLEL ------------------------------------------------------------------------------------------------------------------------------------ Spectral Elements DEF, G750M, MIRROR ------------------------------------------------------------------------------------------------------------------------------------ Target Names BIAS, DARK, NONE ------------------------------------------------------------------------------------------------------------------------------------