STScI Logo
STScI Logo
HST
Banner
STScI

Hubble Space Telescope Call for Proposals for Cycle 17


TOC PREV NEXT PDF

10.5 Technical Review

In Phase I STScI does not perform technical reviews for the majority of the submitted proposals. In Phase II a technical/feasibility review is performed and special attention is given to observations/modes that may damage the instrument, are particularly complex, are recent/experimental, are human and technical resource-intensive, or require the use of limited resources (such as real-time acquisitions or TOO Programs). All technically challenging or infeasible observations are flagged. Note that it is the responsibility of the PI to ensure that none of the observations violate bright objects constraints (see Section 5.1 of the HST Primer).


Space Telescope Science Institute
http://www.stsci.edu
Voice: (410) 338-1082
help@stsci.edu
TOC PREV NEXT PDF

Copyright  | Help  | Printable Page