| Hubble Space Telescope Call for Proposals for Cycle 17 |
9.5 Justify Duplications
(This item is required only for GO and SNAP proposals)
Justify, on a target-by-target basis, any potential duplication with previously accepted GO or GTO observing programs. Use the `Duplication' checkbox in the OS (see Section 8.16) to identify the duplicating observations. See Section 5.2.1 for policies on duplications.
|
Space Telescope Science Institute http://www.stsci.edu Voice: (410) 338-1082 help@stsci.edu |