| Space Telescope Science Institute |
| STIS Instrument Handbook |
| help@stsci.edu |
10.1
• Justify any special requirements (e.g., SHADOW, interactive acquisition, CVZ, target-of-opportunity, time critical scheduling, or the re-use target capability).
• Allow time for CR-SPLIT observations and dithering, as needed.
• Check that your proposal does not violate the policy that restricts the mixing of CCD and MAMA observations in the same visit, (see Section 2.6). Be sure that you are requesting sufficient orbits to allow the MAMA and CCD observations to be done in separate visits. Provide a justification if the scientific needs of your program require violating this policy.
•