STScI Analysis Newsletter
Spectrographs Group (STIS/GHRS/FOS)
October, 2001
Visit the STIS web site
"New in the Last 45 Days" for new information about STIS.
This month: Scaling Side-2 CCD Dark Frames with Temperature
Due to a failure of the STIS primary (Side-1) electronics, the redundant
(Side-2) electronics have been in use since July 2001. The redundant
electronics allow larger fluctuations in CCD temperature, resulting in
significant variations in CCD dark rate (see ISR STIS 2001-003). Eventually,
dark subtraction in the archive pipeline will automatically handle dark rate
variations, but for now darks can be scaled manually as a function of
temperature.
As a proxy for CCD detector temperature, the CCD housing temperature
(CCDHTAV) will be added to STIS science headers. Until this keyword is
available, we will maintain a CCD housing temperature log.
__________________________________________________
Need help? http://www.stsci.edu/instruments/stis/feedback
To unsubscribe from this mailing list send email to majordomo@stsci.edu
with the message: unsubscribe stis_news
The Space Telescope Science Institute is operated by the Association of
Universities for Research in Astronomy, Inc. under NASA contract NAS5-26555
|