Instrument Science Report 00-01:
WFPC2 Cycle 9 Calibration Plan
S. Baggett, S. Gonzaga, J. Biretta, S. Casertano, I. Heyer, A. Koekemoer,
M. McMaster, C. O'Dea, A. Riess, A. Schultz, B. Whitmore, M. S. Wiggs
May 22, 2000
Abstract:
This report presents the details of the WFPC2 Cycle 9 calibration
plans. The proposal suite is aimed at maintaining the calibration
accuracy of WFPC2 via monitoring programs, as well as continuing some
previous proposals into Cycle 9 and performing several new tests. The
standard monitoring programs will be continued (e.g., decontaminations,
photometric and astrometric monitors, darks, biases, internal flats,
and earthflats). In addition, the CTE monitor, PSF and photometric
checks will be performed. Three new programs are planned as well: a red
leak check, a verification of the wavelength stability of the
narrowband and linear ramp filters, and a CTE calibration. The CTE
calibration, in conjunction with WIYN groundbased observations (if
approved), will permit a direct verification of the absolute
photometric calibration of WFPC2 in observations that may be affected
by CTE, providing a more robust determination of the zero point for
many WFPC2 observations.
The Complete Paper is available, (PostScript 0.1 MBytes), HTML, PDF (0.1 MB).
|
 |
|