Instrument Science Report WFPC2 97-03:
Summary of WFPC2 SM97 Plans
J. Biretta, M. McMaster, S. Baggett, and S. Gonzaga
February 9, 1997
Abstract:
We summarize WFPC2 activities and calibration plans for the Second Servicing Mission in early 1997.
The complete paper is available, PDF (0.05 MB) and Post Script (0.17 MB).