Instrument Science Report 99-03:
Summary of WFPC2 SM3a Plans
S. Casertano, S. Gonzaga, J. Biretta, and J. Balleza
Revised version, December 20, 1999
Abstract:
We summarize WFPC2 activities and calibrations planned for the emergency Third Servicing Mission, currently scheduled for launch in December 1999.
The Complete Paper (PostScript, 0.19 MBytes) and PDF (0.1 MB) is available.