WFPC2 Technical Instrument Report 00-02:
Results of the WFPC2 SM3a Lyman-Alpha Throughput Check
-Baggett and Heyer
The far-UV throughput of WFPC2 was monitored during December
1999 and January 2000 for any signs of unexpected throughput
degradation following Servicing Mission 3a. No significant
changes were detected.
The Complete Paper (PDF 0.07 MB)
is available, or contact help@stsci.edu.
|