STScI Logo

Hubble Space Telescope
WFPC2 TIR Abstract

WFPC2 Technical Instrument Report 02-05:

SMOV3B WFPC2 Lyman-Alpha Throughput Check

-L.M. Lubin, B. Whitmore, A.M. Koekemoer, and I. Heyer

The far-UV throughput of WFPC2 was monitored on March 23, 2002, for any signs of unexpected throughput degradation following Servicing Mission 3b. No significant changes were detected.

The Complete Paper (PDF 0.21 MB) is available, or contact help@stsci.edu.