SPACE TELESCOPE USERS COMMITTEE (DRAFT) REPORT APRIL 2000
The Space Telescope Users Committee (STUC) met on 6th and 7th April 2000 in the Board Room of the
Space Telescope Science Institute.
Attended: Bruce Balick, Debra Elmegreen, Chris Impey, Jay Frogel, Suzanne Hawley, George Miley
(Chair), Felix Mirabel, Dave Sanders, Hal Weaver.
Unable to attend: Marc Davis, John Kormendy, Sergio Ortolani
1. 1. GENERAL
We thank the STScI and NASA for their hospitality and openness. The various presentations and
material provided to STUC provided succinct summaries of the most important issues that presently
face the HST project and its users. We were gratified that STUC involvement was solicited in
determining priorities in several areas where difficult decisions will have to be made by the
Institute. Since our last meeting a substantial reorganization of the Institute has taken place with
little disruption to the program. Praise should go to all those involved.
2. STATUS OF PROJECT.
STUC congratulates all those concerned on the complete success of the SM3a service mission that
restored the HST to its full health. We enthusiastically anticipate the substantial increase in
scientific capabilities that should be accomplished by the forthcoming SM3b and SM4 missions. The
installation of the ACS, the WFC3 and COS, will position the HST to continue its leadership role in
astronomy until 2010.
During the next 18 months priorities may have to be set in the ambitious program for the SM3b
repair mission and the associated EVAs. Although we realize that determining such priorities will
involve other criteria than mere scientific ones, we shall be pleased to provide the user
perspective on such issues, if called upon.
3. CRITICAL FUNDING SITUATION.
The STUC recognizes the stress to the Project caused by the recent budget cuts. We regret that
NASA has found it necessary to penalize the HST budget for large shortfalls caused by launch delays
outside the control of the Project. We are proud to be involved with a facility that, after a decade
of operation, is still a flagship for NASA and ESA. Not only is the HST producing a continuous flow
of fundamental astronomical discoveries, but it is also a source of inspiration for the general
public. The importance of the HST in public outreach is reflected by the popularity of the STScI
World Wide Web site, which experiences a larger number of hits than any other science site, after
that of CNN.
Over the years, substantial increase in scientific productivity of the HST has been achieved
despite a large decrease in the budget, funding. We applaud the creativity and effort that has been
used to mitigate the effects of the many budget cuts on HST operations. However, the situation has
now become critical, and is a matter of great concern for STUC. Continued budgetary pressure (i)
will seriously impact the effectiveness of the HST, (ii) is likely to result in a disproportionate
reduction in scientific output and (iii) could result in the failure of one or more of the
cutting-edge instruments that are now under development. The ACS, WFC3 and COS are all crucial for
the HST to maintain its scientific success until the end of the planned lifetime and to continue its
important role in public outreach.
Since the launch of the telescope, one of the most cost-effective expenditures in maintaining the
scientific productivity and public visibility of the HST has been the allocation of funding for
research, the so called "459" budget line item. This has been important, not only because
of its obvious direct effect on scientific production, but also because of the prestigious Hubble
Fellowship program that has harnessed the creativity and expertise many of the best young
astronomers of this generation into doing science with the HST. We regret that during 1999 an
extended 8% budget cut was made to the GO program as a whole and that the number of allocated Hubble
fellowships decreased by more than 40%. A dangerous precedent was set by using "459" funds
to cover unforeseen budget shortfalls and we are worried that further pressure in this area will
recur during the transition to NGST operations. The STUC recommends that the "firewall"
which previously protected HST research funding should be re-established and that only under very
exceptional circumstances should such funds be used for activities other than research support. In
the rare cases where 459 funding is used for other purposes, there must be (i) demonstrated
enhancement of HST science and (ii) the consent of the users. The scientific productivity and
visibility of the HST depends to a large degree on the funded research efforts of the user
community.
4. HST PROPOSAL CATEGORIES - ARCHIVAL RESEARCH.
STUC agrees with the decision to devote up to 100 orbits of Cycle 10 time for a new class of
"INNOVATIVE" proposals that push HST instruments beyond the capabilities that would be
achieved normally. These are proposals that may require special techniques for calibration or use
instruments and observing modes in a unique fashion. Although such proposals are likely to place
additional demands for support, we believe that the potential of long-term scientific payoff is
sufficiently large to warrant a small allocation of additional resources.
Ensuring the optimum use of parallel time is important in maximizing the scientific output of the
telescope, particularly after the advent of the ACS. We are pleased that a Working Group was
convened to consider this question and agree that predefining a small number of parallel programs
can enhance the science. In the past there was some concern about the limited use of parallel
observations. Allowing GOs to propose taking responsibility for entire default parallel programs or
selected parts of such programs, besides maximizing the scientific output of such programs, should
also help increase the use of the archive.
As the mission proceeds the archive is becoming an increasingly important science resource of the
observatory and after 2010 the data archive will be a substantial legacy of the HST. The STUC
therefore believes that the archive must continue to be vigorously supported, in terms of software
tools, data distribution from the Institute and grant support for users. As the mission matures the
relative balance in research funding between direct grant support and archival grant support may
need to be reevaluated. In addition, the STScI could draw the attention of the community to specific
data sets that are in the archives, including those data sets that result from the parallel
programs. Furthermore, the Institute might consider devoting a small fraction of archival funds to
encourage proposals involving specific data sets judged to have an especially large potential for
scientific payoff.
We note that as recommended in our last report, a pilot project has been initiated to outsource
to the community a limited number of calibration tasks that have traditionally been the
responsibility of the Institute and that provision has been made for a new category of such
proposals in Cycle 10. Such a procedure can provide a reasonable way of (i) ensuring that certain
little-used observing modes can continue to be offered and (ii) harnessing technical expertise
within the community in optimizing the scientific exploitation of the telescope and (iii)
facilitating the development of possible new observing modes. We await the results of such a pilot
project with interest, but caution that a determination of its cost effectiveness must take account
a realistic estimate of the total cost (including overhead at the institute and allocated GO
funding).
5. CHANGES TO THE TAC PROCESS
During our Spring 1999 meeting we endorsed proposed changes to the Cycle 9 proposal evaluation
process. We concluded that having fewer broader TAC panels would (i) be effective in encouraging and
rewarding medium-sized and larger proposals without imposing arbitrary discrete steps in proposal
size and (ii) reduce direct conflicts of interest in the TAC. The new procedures appear to have been
generally successful in achieving these goals. Also, the number of letters to the STScI that were
critical about the TAC decreased significantly in 1999. We endorse the plans for the Cycle 10 TAC
and note that the STScI is planning to implement some small iterations to the refereeing system that
should further improve the TAC procedures.
6. FORTHCOMING INSTRUMENTS.
6.1 Advanced Camera for Surveys (ACS). The PI of the ACS, Holland Ford, presented the current
situation in its development. The capabilities of this instrument constitute an enormous advance
over those of WFPC2 and its availability should provide a large boost to the scientific
effectiveness of the HST. We are concerned about the continuing problems in acquiring CCD chips for
the ACS, but is gratifying that the "final" choice of chip need not be inserted into the
ACS until shortly before launch. It is critical that ACS be launched during the SM3b service mission
with an expected performance that is at or close to the specified goals.
6.2. WFC3. We applaud the HST Project for protecting the WFC3 and its dual optical/IR channels
despite the severe budgetary pressures of the past months. The unique imaging capabilities provided
by the combined power of the ACS and WFC3, extending from the far UV to the near-IR will guarantee
the scientific and inspirational importance of the HST for the forthcoming decade in diverse areas
that range from studies of the early Universe to the search for extra-solar planets. The HST will
therefore continue as a vital tool for the Origins Program.
7. SOFTWARE DEVELOPMENTS.
7.1 STScI World Wide Web Site. The STScI is presently revising its WWW site. This is an important
activity. The site is one of the most popular science sites in the world, with a typical hit rate of
~ per day, reflecting the importance of the HST in general scientific outreach. It is also an
indispensable interface between the HST user community and the critical information and
documentation developed by the Institute. For these reasons we strongly endorse this effort. The
newly designed interface could be adapted well for data retrieval (including new and efficient ways
of searching the archives). The new www interface should be released as soon as it has undergone an
evaluation by a large cross section of the user community and the public. Every member of STUC
expressed eagerness to participate in such an evaluation.
7.2 Astronomers Proposal Tool (APT). At our previous two meetings the STUC reviewed and endorsed
the development of the APT, which is a sophisticated replacement for RPS2 and a general tool to
assist proposal development. At the present meeting we received a written update. The APT effort has
been somewhat affected by the budget shortfall. We believe that the continued development of such
user tools should continue with high priority. As we argued previously, a flexible visual interface
for proposal preparation could facilitate new science and will help optimize the productivity of the
telescope. The integration of archival search facilities into the APT would be an extremely useful
capability. Furthermore, the APT should be integrated into the newly designed web site.
7.3 Responsiveness of STSDAS Because STSDAS forms the link between HST data and the scientific
output of most of the community, its maintenance and development is a critical. STUC was presented
with a written report that aptly described the manner in which the STScI assesses and addresses the
data calibration and analysis needs of the user community. We also appreciate the information about
how development priorities are set within the STSDAS software group. These priorities seem prudent.
However, we encourage the STScI to be more proactive in informing the user community how suggestions
and recommendations for new and improved software should be communicated to the project.
8. MOVING TARGET CAPABILITIES.
The STUC commends the Institute for the significant progress made during the past several years
in the planning and scheduling of Moving Target (i.e. planetary) observations. However, the recent
staff reduction in this area threatens to negate these recent gains and increase the risk of failed
observations. We present that the Institute monitor the situation and report on it at the next
meeting of STUC.
9. PRIORITIES IN FUTURE COST CUTTING
As part of a cost-cutting process to allow the ramping up of NGST activities while simultaneously
operating the HST, the STScI is reviewing all aspects of the step by step process by which science
is produced and is assessing the importance of the various ingredients in determining the total cost
of a project. Particular attention is being payed to the cost effectiveness of rarely used modes of
the mature instruments. The STUC has agreed to actively work with the Institute on a more detailed
analysis of such matters during the next several months. Relevant data to be compiled by the
Institute include (i) description of the candidate modes for discontinuation (ii) titles and
descriptions of past projects that used them and some measure of the research significance (iii)
alternative modes that could be used for these programs, after installation of the ACS and the
NICMOS cooler and (iv) an analysis of the annual cost savings that would result if the modes were
discontinued. Rarely used observing modes should not be eliminated until after a careful analysis of
their use has been made and there has been consultation with the wider user community.
10. DATES OF NEXT MEETING.
The dates of the next STUC meeting will be 5th and 6th October 2000. Possible subject to be
considered include (i) priorities in cost-cutting, (ii) the situations with COS, ACS and WFC3, (iii)
progress with the APT and (iv) STSDAS and the ACS pipeline.
|