The STUC appreciates the need to maximize the amount of science which
can be achieved with NICMOS. We recognize, however, that there is important
and timely science to be undertaken with the other working instruments, that
there is a large backlog of unfinished cycle 5 and 6 observations, and
that other instruments may fail prematurely. We recommend the following,
predicated upon the current best estimate of a 1.5 year
NICMOS cryogen lifetime:
- That NICMOS calibration observations be given high priority.
- That the scheduling of cycle 7 NICMOS GO and GTO observations be
accelerated. This will enhance the possibility of proposing followup
observations with NICMOS.
- That the Cycle 7 TAC, or a subset thereof, NOT be reconvened.
There are two reasons not to reconvene the TAC.
- Cycle 7 proposals were written for a different instrument under
different circumstances. For example, thermal backgrounds are much
lower than expected, which makes some observations more feasible. One
also writes more conservative proposals for the first year of a
four year mission than one does for the last year.
- The names of the TAC members are public knowledge, which fosters the
possibility of lobbying the committee. It is not fair to the members
of the TAC to subject them to such pressure.
- That a NICMOS-only delta-Call for Proposals (delta-CP) be announced and
undertaken as soon as possible. By the time proposals are due, there
will be a body of NICMOS data, permitting detailed characterization of
instrumental performance, and affording the possibility to propose
follow-on observations.
- That a NICMOS-intensive campaign, using proposals from the delta-CP, be
undertaken between January 1998 and October 1998, when cryogen depletion
is expected.
- That a representative percentage of cycle 8 and 9 GTO time be scheduled
in cycle 7.
We are confident that HST and STScI will closely monitor the thermal history
of NICMOS. In the event that the thermal short breaks, and the projected
lifetime of the cryogen extends to at least the fall of 1999, we recommend
that the delta-CP be cancelled or, if proposals have already been collected,
that they be held for a normal cycle 8 review.