VM Test Results/Conclusions

VM1 Test Results

VM2 Test Results

The two VM test campaigns show that we basically have a working instrument and test facility
  • End-end functioning
  • Blanket performance
  • A pointe source looks like a point source
  • The cal source illuminates the spectrometer detectors
  • Imager and spectrometer are both in focus (or not)
  • The wheels go round, the CCC moves, the sensors can be read out
  • Throughput is what we expected to see
  • We can get dark
  • Checkout data chain
  • Annealing of detectors, detector modes, pom heater works
  • Enable on-going rationalisation and refinement of test plans
  • DHAS used to reduce & analyse data, including cubes
  • There is a lot of test data still to reduce and analyze
  • There are 9 months in which to correct the MTS