STScI Logo
STScI Logo
HST
Banner

Two-Gyro Science


HST's normal operational mode utilizes three gyros out of the six onboard the spacecraft to provide a highly accurate attitude reference as part of the pointing control system (PCS). Over time these gyros eventually fail leaving the spacecraft with less redundancy and, eventually, with less than the number of gyros required (3) for the PCS to operate normally.

The Two-Gyro Science (TGS) mode is a means of providing spacecraft attitude control and slew capability, in the case of only two operational gyros, with sufficient accuracy to continue science operations.

TGS is a contingency mode targeted for use in the event that the HST is in a two-gyro condition prior to Servicing Mission 4 and/or at HST end-of-life. It is also a degraded mode in the sense that science operations can continue, but with higher jitter and less efficiency and flexibility than with normal operations using three gyros. Certain classes of current science operations will likely be heavily constrained or not possible in Two-Gyro mode.


Presentations

  • HST Project Status Review (5/10/04) ppt
  • Two-Gyro Science OCR/FRR presentation (10/24/03) pdf   ppt
  • Two-Gyro Science Design Review (02/12/04)
    pdf B&W
      pdf Color   ppt
  • Two-Gyro Science Design Review Issues Raised pdf

  • ESS All-Hands Meeting (9/11/03) ppt

  • HST Mission Status Review (10/28/03) pdf   ppt
  • HST Project Status Review (12/15/03) pdf   ppt
  • HST Mission Status Review (01/13/04) pdf   ppt

    Link to HST Project Presentations click here

    Studies

  • All-sky Scheduling Study Results pdf   ppt

  • FHST Star Density Study pdf

  • Comparision of SPSS and PASS Earth Occultation models pdf

    Link to HST Project Studies click here

    Documents

    ICD updates

  • Current ICD Status click here

  • Pending DCRs click here



    Requirements

  • TGS Mode Phase I Requirements - Baseline (12/17/03) pdf

    Testing

  • TGS Mode Phase I Test Plan (Draft) (3/18/04) pdf   doc

    Link to HST Project Documents click here

    TGS TEAM LINKS

    TRANS   SPIKE   SPSS   PASS   Test   Commanding

    Meeting Minutes

  • TGS Open Issues pdf
  • TGS Closed Issues pdf
  • TGS Open Action Items pdf
  • TGS Closed Action Items pdf

  • TGS Project meeting on 04/21/04 pdf
  • TGS Project meeting on 03/31/04 pdf
  • TGS Project meeting on 03/24/04 pdf
  • TGS Project meeting on 03/10/04 pdf
  • TGS Project meeting on 03/03/04 pdf
  • TGS Project meeting on 02/18/04 pdf
  • TGS Project meeting on 01/21/04 pdf
  • TGS Project meeting on 01/14/04 pdf
  • TGS Project meeting on 01/07/04 pdf
  • TGS Project meeting on 12/17/03 pdf
  • TGS Project meeting on 12/10/03 pdf
  • TGS Project meeting on 12/03/03 pdf
  • TGS Project meeting on 11/19/03 pdf
  • TGS Project meeting on 11/12/03 pdf
  • TGS Project meeting on 06/26/03 pdf



    Link to HST Project Minutes click here

  • Find a Product:
    See all products


    Find a Project:
    See all projects

    Project News at STScI


    Two- Gyro Contact

    For further information, contact web page adminstrator Lee Quick
    Two- Gyro Contact

    For further information, contact web page adminstrator Lee Quick

    Administrative Shortcuts



    Copyright  | Help  | Printable Page