 |
|
 |
 |
Resources for HST Phase II Proposal Development
Cycle 16 Phase II Submission Deadline: May 11, 2007
Routine Observing Starts in July 2007
|
This page has all the documentation and tools necessary to develop,
submit, and monitor your HST Phase II proposal.
Policies, guidelines and grant information
Writing and evaluating your Phase II proposal
Additional documentation for Phase II proposal preparation
- Instrument Handbooks and Reports
- The home pages for the individual scientific instruments (
ACS,
FGS, NICMOS,
and
WFPC2) contain pointers to critical technical documentation such
as the Instrument Handbooks and Instrument Science Reports.
- Fixed Target Coordinate Measurement
- The HST reference frame has been changed, starting with Cycle 15 observations. HST will now use the
GSC II, which has been calibrated to be on the International Celestial Reference System. Target
coordinates from GSC I can still be used if scientifically necessary. Click on the link above to
access tools and instructions for retrieving your target coordinates from the HST Guide Star Catalog
and/or measuring your target in the HST Guide Star Coordinate system. There is also a tool for
converting GSC I coordinates into GSC II coordinates.
- HST Documents
- This page provides a list of documents that could be useful to the observer.
Information regarding the status of programs, change requests,
and Hubble Observation Problem Reports (HOPRs)
This is an address and phone list for the PCs.
For help at any point during proposal preparation, please contact your PC.
|
|
 |
|
|
 |
 |