WFPC2 Technical Instrument Report 02-05:
SMOV3B WFPC2 Lyman-Alpha Throughput Check
-L.M. Lubin, B. Whitmore, A.M. Koekemoer, and I. Heyer
The far-UV throughput of WFPC2 was monitored on March 23, 2002,
for any signs of unexpected throughput degradation following
Servicing Mission 3b. No significant changes were detected.
For a paper copy of this report simply contact
help@stsci.edu.
|