WFPC2 Technical Instrument Reports (TIRs)
Listed below are the titles and abstracts of the WFPC2 Group's Technical Instrument Reports (TIRs).
Paper copies of TIRs can be requested thru help@stsci.edu.
2005:
TIR WFPC2 05-04: Creating a WFPC2 Yearly Superdark (Abstract)
TIR WFPC2 05-03: Creating a WFPC2 Yearly Superbias (Abstract)
TIR WFPC2 05-02: Delivering WFPC2 Weekly Dark Reference Files to the Archive (Abstract)
TIR WFPC2 05-01: Creating WFPC2 Weekly Dark Reference Files & Hot and Warm Pixel Tables (Abstract)
2002:
TIR WFPC2 02-06: Predicting Photometry Errors due to Linear Ramp Filter Offsets (Abstract)
TIR WFPC2 02-05: SMOV3B WFPC2 Lyman-Alpha Throughput Check (Abstract)
TIR WFPC2 02-04: SMOV3B WFPC2 Photometry Check (Abstract)
TIR WFPC2 02-03: SMOV3B WFPC2 UV Contamination Monitoring and Throughput Check (Abstract)
TIR WFPC2 02-02: SMOV3B Flat Field Verification (Abstract)
TIR WFPC2 02-01: SMOV3b Check of the WFPC2 Point-Spread-Function (Abstract)
2001:
TIR WFPC2 01-02: Testing the On-The-Fly-Reprocessing System with WFPC2 Data (Abstract)
TIR WFPC2 01-01: Shutter Jitter History Measured from INTFLATs. (Abstract)
2000:
TIR WFPC2 00-05: Testing the On-The-Fly-Calibration System with WFPC2 Data. (Abstract)
TIR WFPC2 00-04: WFPC2 Internal Monitoring. (Abstract)
TIR WFPC2 00-03: SM3a SMOV WFPC2 Photometry Check. (Abstract)
TIR WFPC2 00-02: Results of the WFPC2 SM3a Lyman-Alpha Throughput Check. (Abstract)
TIR WFPC2 00-01: SMOV3a Flat Field Stability Check. (Abstract)
1999:
TIR WFPC2 99-02: Preliminary Results of the Noiseless Preflash Test. (Abstract)
TIR WFPC2 99-01: WFPC2 Aperture Photometry Corrections as a Function of Chip Position. (Abstract)
1998:
TIR WFPC2 98-04A: Addendum to TIR 98-04. (Abstract)
TIR WFPC2 98-04: Proposed Modification to the WFPC2 SAA Avoidance Contour. (Abstract)
TIR WFPC2 98-03: WFPC2 Dark Current Evolution. (Abstract)
TIR WFPC2 98-02: Analysis of the Excess Charge in WFPC2 Overscans. (Abstract)
TIR WFPC2 98-01: Time Dependence of the CTE on the WFPC2. (Abstract)
1997:
TIR WFPC2 97-11: Long-Term Study of Bias Jumps. (Abstract)
TIR WFPC2 97-10: WFPC2 Photometry from Subtraction of Observed PSFs. (Abstract)
TIR WFPC2 97-09: The WFPC2 PSF Library. (Abstract)
TIR WFPC2 97-08: SMOV Flat Field Check. (Abstract)
TIR WFPC2 97-07: WFPC2 Internal Monitoring for SM97. (Abstract)
TIR WFPC2 97-06: SMOV Check of WFPC2 PSF Stability. (Abstract)
TIR WFPC2 97-05: Results of the WFPC2 SM-2 Lyman-Alpha Throughput Check. (Abstract)
TIR WFPC2 97-04: VISFLAT Channel Monitoring. (Abstract)
TIR WFPC2 97-03: OTA Focus during SMOV. (Abstract)
TIR WFPC2 97-02: SM-2 UV Monitoring and Cooldown Procedure. (Abstract)
TIR WFPC2 97-01: Results of the WFPC2 SMOV Relative Photometry Check. (Abstract)
|