Recommendations from the STUC
May 1997 Meeting
12 June 1997
NICMOS-specific recommendations.
- A.
- The STUC appreciates the need to maximize the amount of science which
can be achieved with NICMOS. We recognize, however, that there is important
and timely science to be undertaken with the other working instruments, that
there is a large backlog of unfinished cycle 5 and 6 observations, and
that other instruments may fail prematurely. We recommend the following,
predicated upon the current best estimate of a 1.5 year
NICMOS cryogen lifetime:
- That NICMOS calibration observations be given high priority.
- That the scheduling of cycle 7 NICMOS GO and GTO observations be
accelerated. This will enhance the possibility of proposing followup
observations with NICMOS.
- That the Cycle 7 TAC, or a subset thereof, NOT be reconvened.
There are two reasons not to reconvene the TAC.
- Cycle 7 proposals were written for a different instrument under
different circumstances. For example, thermal backgrounds are much
lower than expected, which makes some observations more feasible. One
also writes more conservative proposals for the first year of a
four year mission than one does for the last year.
- The names of the TAC members are public knowledge, which fosters the
possibility of lobbying the committee. It is not fair to the members
of the TAC to subject them to such pressure.
- That a NICMOS-only delta-Call for Proposals (delta-CP) be announced and
undertaken as soon as possible. By the time proposals are due, there
will be a body of NICMOS data, permitting detailed characterization of
instrumental performance, and affording the possibility to propose
follow-on observations.
- That a NICMOS-intensive campaign, using proposals from the delta-CP, be
undertaken between January 1998 and October 1998, when cryogen depletion
is expected.
- That a representative percentage of cycle 8 and 9 GTO time be scheduled
in cycle 7.
We are confident that HST and STScI will closely monitor the thermal history
of NICMOS. In the event that the thermal short breaks, and the projected
lifetime of the cryogen extends to at least the fall of 1999, we recommend
that the delta-CP be cancelled or, if proposals have already been collected,
that they be held for a normal cycle 8 review.
- B.
- The STUC finds the NIC-3 science sufficiently compelling to recommend at
least one NIC-3 campaign with a defoccussed secondary, subject to the
following caveats:
- we assume that the dewar rebound stops, and NIC-3 cannot be brought into
focus with the PAM. If it can, this recommendation is moot.
- we assume that the STIS focus can be maintained after the movement of
the HST secondary mirror. This will ensure that two instruments will be
operable, will permit parallel observations, and will mitigate some of
the concerns about the failure of the HST secondary mirror focussing
mechanism.
The STUC recommends that the HST project reconsider the risks involved
with moving the secondary mirror. If the project is willing to accept the
risks, the STUC recommends a NIC-3 campaign be scheduled when the
HDF can be observed. We recommend that the scheduling of this campaign be
planned well in advance, and announced in the delta-CP. In the event that
no delta-CP is necessary, this campaign should occur during cycle 8.
- C.
- The STUC recommends that no changes be made in the length of the
proprietary period for cycle 7 NICMOS GO data. Policies concerning the
length of the proprietary period should apply equally to all GO data, and
should be specified in advance in the Call for Proposals.
- D.
- The STUC recommends that the STScI work closely with the NICMOS team to
ensure that the proper calibration files are placed in the data processing
pipeline, so that the data products derived from the accelerated NICMOS GO
observations are scientifically useful. Every effort should be made to
populate the pipeline data base with on-orbit darks and flats.
Those darks and flats that have not been obtained to date and are
anticipated to be heavily used in the early GO and GTO program should be
scheduled in the calibration program as soon as possible.
- E.
- Any decision to fly a cryogenic cooler for NICMOS should be made only after
due considerations of all potential impacts on the spacecraft and the other
instruments, and on the financial resources of the project. Funding for
the cryogenic cooler must not be taken from UPN 459, and must not decrease
the funding available for the year 2002 instrument(s).
Recommendations about Operations.
- F.
- The STUC recommends that a major effort be undertaken to ensure parallel
observing capabilities with the NICMOS and STIS, and commends the STScI
for its efforts to date. The reduced lifetime of NICMOS makes parallels all
the more urgent. We encourage the STScI to seek input from the
community as to the best use of the Cycle 7 parallel time. A small workshop
should be held in July or early August and a working group for parallels
should be formed.
- G.
- The STUC is deeply concerned about the proposals by the HST Project to
decommission operating science instruments.
- The STUC was told that the WFPC2 would be unsupported, and available only
for backup use, after the ACS is commissioned in 1999. Decommissioning of
the WFPC2 will cripple many research topics requiring narrow band
imaging such as the investigation of star forming regions, Herbig-Haro
objects and stellar jets, HII regions, planetary and proto-planetary
nebulae, supernova remnants, and these objects in nearby galaxies.
ACS does not support the compliment of narrow-band filters available on
WFPC2. Over 30% of WFPC2 usage, and many of the most spectacular images
released by HST, such as M16, the Orion Nebula, and the Helix, were
obtained through the narrow band filters. Additionally, research requiring
long time baselines, such as measurements of the variability or proper
motions of emission line objects, will also be precluded.
- The STUC is also deeply concerned about the proposal by the HST Project to
discontinue scientific use of the Fine Guidance Sensors after cycle 8.
The astrometric science undertaken with the FGS, notably determination of
stellar masses from the orbits of visual binaries, require long
time baselines, and sustained access to the FGS.
We urge that the HST project and the STScI consult with the community, and
to take into account the impacts on the science, prior to making any
decisions concerning the decommissioning of science instruments.
- H.
- The STUC recommends that STScI provide additional support for new users
to counter the increasing complexity of the new HST instrumentation.
Phase 2 proposals require a significant investment of time
for all users, but are especially daunting to new users who have never faced
RPS2. While new users can (and are encouraged to) visit STScI for assistance
in preparing their Phase 2 proposals, they are often unable to do so for
financial reasons. Preparatory funding is not available prior to Phase 2
submission, and even if it were, current budget guidelines restrict users to
$3,000 in loaded travel costs. One trip to STScI can consume a
substantial portion of these costs.
Improved new-user support could include:
- A New Users Guide which provides a step-by-step description
of Phase 2 preparation, including examples such as a sample exposure
time calculation using STScI Web tools.
- Enhanced one-on-one RPS2 and contact scientist support for Phase 2.
Possibilities include user visits to STScI (as done now), remote STScI
support outposts, or traveling STScI training sessions. Travel costs for
new users should be supported outside the regular budgetary process.
- Support for RPS2 under LINUX. Not all users have access to SUN hardware,
and the use of PCs running LINUX is increasing in the astronomical
community. We ask that the STScI look into the costs
involved in porting RPS2 to LINUX.
- I.
- The STUC recommends that the STScI exhibit flexibility in the due dates of
phase-II proposals in those cases where required RPS2 functions are not yet
completely incorporated
Other recommendations.
- J.
- The STUC recommends that the number of GO programs accepted during cycle 8
be limited by the TAC and proposal pressure, and not to any preset number
of programs.
- K.
- The STUC recommends that the STScI restore the Sabbatical Visitor Program,
cut due to a recent decrease in the UPN 458 budget, as soon as a funding
opportunity can be identified.
- L.
- The STUC recognizes the enormous contribution to US astronomy that is
made by the Hubble Fellowship program. We realize that the policies
regarding the number of fellows per institution is an AURA, not
an Insitute, policy. We feel strongly, however, that the present
policy of one fellow per institution per year is not in the best interest
of the fellows, given the current level of support for the program. If the
number of fellowships awarded continues to rise, the distribution problem
will only worsen. We urge the STScI to petition to AURA to revert to the
original rule of no more than 10% of the total pool of fellows be allowed in
residence at any one institution in an academic year.
- M.
- The STUC recommends that the STScI investigate how to tune the HST
archival research program better to the natural, yearly funding cycles
of Universities. Archival proposals are generally requests for funding
in support of students and postdocs, and are awarded by the STScI TAC's
based on scientific merit. Since the data already exists there is no
fundamental need to tie the evaluation of Archival proposals to the
same time-line as the regular GO proposals, which, in addition to
scientific merit, are driven by instrument and telescope issues and
scheduling opportunities. Future GO proposal cycles may be severely out
of synch with normal funding cycles at Universities (for example, cycle
7 might be as long as 20 months). Requiring the Archival program to follow
this same schedule causes hardship to students and postdoctoral researchers.
- N.
- The STUC requests that the HST project and the STScI move forward with
plans for a 2005 servicing mission, and that the community be solicited to
provide a new instrument to be placed in Hubble Space Telescope during that
last servicing mission. The HST is uniquely capable of
- observing at ultraviolet wavelengths, a capability not duplicated in
any current or planned mission,
- exceeds the capabilities of ground based telescopes in obtaining
spatially resolved spectroscopy of very complex sources, and
- offers very low thermal backgrounds in the near-IR.
Given that by 2005 the Space Telescope Imaging Spectrograph will have been
eight years on orbit, the Advance Camera for Surveys will have been six
years on orbit, and the 2002 instrument three years on orbit, the
likelihood is significant that at least one instrument will have degraded or
failed by 2005. To ensure that HST is providing cutting-edge scientific
results in the 2005 and beyond timeframe, one last instrument opportunity
would yield very significant benefits. Continued operations of HST with a
new instrument in 2005 was highly recommended by the HST and Beyond
Committee.
- O.
- The STUC found that by having access to the written presentations in
advance, the meeting was streamlined. We recommend that this practice
continue at future meetings. Members of the STUC, or invitees of the
STUC, are urged to reciprocate by preparing material in advance for
relevant STScI and HST project staff.
Dr. Fred Walter, chairman