Hubble Cycle 34 Proposal Selection

STScI Newsletter
2026 / Volume 43 / Issue 02

About this Article



Laura Watkins (lwatkins[at]stsci.edu), Aleksandra Hamanowicz (ahamanowicz[at]stsci.edu), and Amy Jones [amjones[at]stsci.edu)

Published September 21, 2026

STScI recently completed the proposal review and telescope allocation process for Hubble Cycle 34. This hybrid review was comprised of External panels that were fully asynchronous, Discussion panels that met virtually, and an Executive Committee that also met online this year due to budgetary considerations. As always, the reviewers were impressed by the extremely high quality of the proposals and the compelling science, and we were impressed by the dedication, commitment, and integrity of all those involved in the process, both as reviewers and those behind the scenes.

Here, we summarize the process and results of the Hubble Cycle 34 proposal review, and discuss upcoming changes for Cycle 35 and beyond.

Proposal Submissions

The Cycle 34 Call for Proposals (CfP) was released on December 12, 2025, announcing observing opportunities with Hubble’s current instrumentation — the Advanced Camera for Surveys (ACS), Cosmic Origins Spectrograph (COS), Fine Guidance Sensors (FGS), Space Telescope Imaging Spectrograph (STIS), and the Wide Field Camera 3 (WFC3) — and opportunities to request funding for theoretical and archival research.

There were a few major items of note:

  • Due to reduced grant funding, Legacy Archival programs were not offered.
  • Due to a decline in submissions in the Large-Scale Structure science area, there was no separate review panel for this area. Proposals in this area were distributed among panels in other science areas.

A number of special initiatives from previous years were continued to encourage proposals in special-interest areas, including: Ultraviolet (UV) Initiative proposals, Transiting Exoplanet Survey Satellite (TESS) coordinated proposals, Archival Cloud Computation Studies proposals, and Calibration proposals. In addition, the Rocky Worlds Director’s Discretionary Time (DDT) Program offered opportunities to submit proposals that exploit or have synergy with this rich new dataset. The Long-Term Monitoring (LTM) Initiative introduced last cycle was continued, and the Roman Preparatory Science (RPS) Initiative was offered again but renamed the Hubble Roman Science Initiative (HRS) in recognition of Roman’s then-imminent (now successful!) launch. We also offered a new initiative: the Habitable Worlds Observatory (HWO) Precursor Science (HPS) Initiative. We discuss these in more detail below.

As in previous cycles, it was possible to request joint time on JWST, Chandra, XMM-Newton, and NOIRLab and NRAO facilities alongside HST observations.

The Phase I deadline was April 16, 2026. Any submissions received after the deadline were rejected.

At the deadline, we received a total of 884 proposals. Of these, 52 proposals were disqualified for page limit, template modification, policy, or anonymity violations. This left a total of 832 proposals reviewed:

  • 733 General Observer (GO) programs, requesting a total of 19,101 orbits;
  • 27 Snapshot (SNAP) programs, requesting 3,948 targets;
  • 72 Archival Research (AR) programs, of which 26 were in the Theory category.

These proposals included 3,399 unique investigators from 53 countries, and 43 U.S. states and territories.

This number of submitted proposals was  higher than Cycle 33 (which had 833 submitted, 800 reviewed), although lower than Cycle 32 (937 submitted, 930 reviewed). The GO orbit request was also  higher than for Cycle 33, in line with the increased number of proposals.

Proposal Reviews

Approximately 35% of the proposals were sent for asynchronous External review by 111 reviewers separated by subject area; 60% of the proposals were reviewed by 78 reviewers in Discussion panels separated by subject area; and the remaining 5% were reviewed by an Executive Committee (EC) of 15 members covering all subject areas. The distribution of proposals by topic among review panels is described in the table below.

Proposal Review Panels
Science Area Very Small General Observer (GO) Small GO, Medium GO Target of Opportunity (ToO) Regular Archival Research (AR), Snapshots (SNAPs) <250 Large GO, Treasury GO, SNAPs >250
Solar System Discussion Discussion Discussion Discussion Executive Committee (EC)
Exoplanets External Discussion Discussion External EC
Stellar Physics External Discussion Discussion External EC
Stellar Populations External Discussion Discussion External EC
CGM-IGM Discussion Discussion Discussion Discussion EC
Galaxies External Discussion Discussion External EC
Supermassive Black Holes Discussion Discussion Discussion Discussion EC
Transients     Discussion    

 

The External review process and the preliminary phases of the Discussion and EC processes were conducted in May. The virtual Discussion panel meetings were held in late June through early July. Since External proposals are reviewed asynchronously, the panelists can span the globe. Because of the synchronous component, Discussion panelists were drawn from Eastern Europe to Hawaii. To accommodate the wide range of time zones, the Discussion panel meetings ran across four six-hour days to allow plenty of time for comprehensive discussions and writing feedback.

We continue to strive for impartiality and fairness in the HST review process. Conflicts of interest for each reviewer were identified, including competing proposals, mentoring relationships, family members, and close collaborations. Panelists were not permitted to review, grade, or discuss proposals for which they were conflicted. As with most NASA programs, this was a Dual-Anonymous Peer review.

A total of 148 proposals were flagged for compliance issues, of which 52 were judged to be severe violations and were disqualified from the review, and 96 were judged to be minor violations and were reviewed but issued warnings for future cycles. Some proposals were disqualified and/or issued warnings for more than one reason; overall there were 156 issues, of which 53 were judged to be disqualifications and 103 were judged to be warnings. The nature of the compliance issues included:

  • 10 proposals exceeded the page limits (10 disqualifications, 0 warnings).
  • 24 proposals were noncompliant or only in marginal compliance with our Dual-Anonymous Peer Review (DAPR) guidelines (9 disqualifications, 15 warnings).
  • 111 proposals were found to violate our formatting requirements and had modified the font, font-size, margins or paper size of the proposal templates, had changed the text of the required headings, or otherwise changed the template (29 disqualifications, 82 warnings).
  • 6 proposals were found to be in-cycle duplications (4 disqualifications, 2 warnings).
  • 2 proposals were joint programs that were not marked as multi-observatory in APT (2 warnings).
  • 3 proposals were flagged for other policy issues (1 disqualification; 2 warnings).

In previous cycles, template modifications have largely been found during the Telescope Allocation Committee (TAC) review. In this cycle, we were able to employ an internal tool that ran automatic checks for template violations. All issues flagged by the tool were verified before any action was taken. This process revealed more template modifications than were caught in previous cycles. We discuss this issue below regarding Cycle 35 plans.

Together, the reviewers provided recommendations to the Director, who approved 124 regular GO, SNAP, and AR proposals totaling 2,731 awarded prime orbits and 791 SNAP targets. Programs will start executing at the beginning of Cycle 34 on November 1, 2026. Notifications were sent on July 21, 2026.

Approved Science Programs

Overall, 832 GO, SNAP, and AR proposals were reviewed. Of these, 124 proposals were approved. This includes 106 GO programs for a total of 2,731 orbits (49 Very Small for 391 orbits, 34 Small for 757 orbits, 19 Medium for 922 orbits, 4 Large and Treasury for 661 orbits), 8 Snapshot programs for 791 targets, and 10 Archival Research programs (8 Regular and 2 Theory).

The approved programs included 60 UV Initiative programs, 4 Long-Term Monitoring programs, 6 Hubble Roman Science programs, 9 Habitable Worlds Observatory Precursor Science programs, 1 Cloud Computing program, and 1 Data Science Software program. A number of joint programs were also approved, including 1 HST-Chandra program, 7 HST-JWST programs, 1 HST-NRAO program, 3 HST-NOIRLab programs, and 3 HST-XMM-Newton programs.

In addition, 16 ToO activations were approved across 10 programs: 2 ultra-rapid activations of <2 days, 5 disruptive activations of 2 to 21 days, and 9 nondisruptive activations of >21 days. No Flexible Thursday activations were approved. 2 of the approved ToO programs requested Carry-Over status to Cycle 35.

View a List of the Cycle 34 Approved Programs

The overall success rate for Cycle 34 proposals was 15%, compared to 18.9% in Cycle 33 and 17.3% in Cycle 32. PIs from ESA member countries led 19.4% of the accepted Cycle 34 programs (compared to 23% in Cycle 33 and 30% in Cycle 32). Additional statistics are provided in Table 1.

Summary of Requested and Approved Proposal Statistics
Proposals Requested Approved % Accepted ESA Approved ESA % Total
General Observer 733 106 14.5% 24 22.6%

Very Small

334 49 14.7%    

Small

249 34 13.7%

Medium

111 19 17.1%

Large and Treasury

45 4 8.9%
Snapshot (SNAP) 27 8 29.6%   0.0%
Archival Research (AR) 72 10 13.9%   0.0%

Regular AR

46 8 17.4%    

Regular Theory

26 2 7.7%
Total 832 124 14.9% 24 21.1%
Primary Orbits 19,101 2,731 14.3% 472 17.3%

 

WFC3 remains the most-awarded instrument, with 60% of the allocated time (55% in Cycle 33). 13% (17%) was allocated for COS, 18% (17%) was allocated for STIS, and the remaining 9% (6%) was allocated for ACS. Overall, 68.5% of the allocated observations are for imaging and 31.5% are for spectroscopy. A detailed breakdown of observing modes is given in Table 2. 57% of the approved programs are UV orbits (1,566 of 2,731).

Summary of Requested Instruments and Observing Modes for Approved Programs
Configuration Mode Prime % Coordinated Parallel % Total % Instrument Prime Usage Instrument Prime and Coordinated Parallel Usage SNAP Usage (Targets)
ACS/SBC Imaging 6.3%   5.5% 9.3% 20.8% 8.0%
ACS/SBC Spectroscopy      
ACS/WFC Imaging 2.7% 92.0% 15.1%
ACS/WFC Ramp Filter 0.3%   0.2%
ACS/WFC Spectroscopy      
COS/FUV Spectroscopy 12.0%   10.3% 13.4% 11.5% 13.0%
COS/NUV Imaging 0.6%   0.5%
COS/NUV Spectroscopy 0.8%   0.7%
STIS/CCD Imaging 1.1%   0.9% 17.6% 16.5% 13.0%
STIS/CCD Spectroscopy 4.2%   3.6%
STIS/FUV Imaging      
STIS/FUV Spectroscopy 4.1%   3.6%
STIS/NUV Imaging      
STIS/NUV Spectroscopy 8.2%   7.0%
WFC3/IR Imaging 5.7% 1.7% 5.1% 59.7% 54.9% 66.0%
WFC3/IR Spectroscopy 0.8%   0.6%
WFC3/UVIS Imaging 52.1% 6.3% 45.7%
WFC3/UVIS Spectroscopy 1.1%   1.0%

 

One major shift we have seen since the introduction of Dual-Anonymous Peer Review (DAPR) is the increased success of first-time Principal Investigators (PIs). In Cycle 34, 31% of PIs are first-time PIs (38 of 121 unique PIs). This continues the trend we have seen since the introduction of DAPR (around 30%), and is in stark contrast to earlier cycles where the typical fraction of first-time PIs was 5%.  

The Cycle 34 proposal/orbit distribution per science category is as follows:

  • 10.5% / 11.9% for Exoplanets and Planet Formation (relative to 11.8% / 12.3% submitted)
  • 13.7% / 14.6% for Galaxies (20.3% / 22.1% submitted)
  • 4.8% / 10.9% for Intergalactic Medium and Circumgalactic Medium (6.0% / 8.1% submitted)
  • 8.1% / 2.5% for Solar System (6.0% / 3.3% submitted)
  • 36.3% / 21.2% for Stellar Physics (27.8% / 23.1% submitted)
  • 14.5% / 28.6% for Stellar Populations (15.5% / 20.4% submitted)
  • 12.1% / 10.3% for Supermassive Black Holes (12.6% / 10.8% submitted)
Stacked columns show Submitted Orbits in dark purple, Approved Orbits in light purple, Submitted Proposals in dark red, and Approved Proposals in blue. The y-axis ranges from 0% at the bottom to 40% at the top. The x-axis from left to right: Exoplanets, Galaxies, IGM and CGM, Solar System, Stellar Physics, Stellar Populations, and Supermassive Black Holes. Data appear as columns side by side per topic. Exoplanets hover just above 10% for all; Galaxies < 20% for dark purple, and dark red, and below 15% for light purple and blue; IGM and CGM below 10% for dark purple, above 10% for light purple, and around 5% for dark red and blue; Solar System < 5% for dark and light purple, above 5% for dark red, < 7% for blue; Stellar Physics > 20% for dark and light purple, > 25% for dark red, and > 35% for blue; Stellar Populations about 20% for dark purple, < 30% for light purple, and around 15% for dark red and blue; Supermassive Black Holes all just above 10%.
Submitted and approved orbit and proposal counts per science category for Cycle 34.

New and Continuing Initiatives

One new initiative was offered in Cycle 34:

The Habitable Worlds Observatory (HWO) is a planned large ultraviolet-optical-infrared space telescope designed to search for signs of life outside our solar system. However, with its powerful capabilities, it will transform a broad range of astronomy fields. The HWO Precursor Science (HPS) Initiative was introduced to encourage proposals with Hubble that will support HWO science planning, and inform mission architectures and trades with the goal of reducing the cost and risk of HWO’s future design and development. We received 41 HPS proposals, of which 9 were approved (all GOs) for a total of 475 orbits. They represented 4.9% of the reviewed proposals, and had a better-than-average success rate of 22%.

Two initiatives introduced in Cycle 33 continued in this cycle:

The Roman Preparatory Science Initiative (RPS) was renamed to the Hubble-Roman Science Initiative (HRS), since Roman will be operational in Cycle 34. The goals remain the same: to encourage proposals that complement and enhance the scientific impact of Roman observations, or are essential to achieving critical science goals of future Roman programs. We received 20 HRS proposals, of which 6 were accepted (5 GOs for 245 orbits and 1 AR). They represented 2.4% of submitted proposals and had a better-than-average success rate of 30%.

In addition, the Long-Term Monitoring (LTM) Initiative continued, highlighting Hubble’s longevity and importance for time-domain science, and encouraging proposals that exploit this rich heritage. Proposers may also submit Future-Cycle programs over 5 cycles instead of the standard 3 cycles. We received 18 LTM proposals, of which 4 were approved, including 1 program that used the 5-cycle Future-Cycle opportunity. They represented 2.2% of submitted proposals and had a better-than-average success rate of 22%.

The strong response and excellent success rates for all of these initiatives demonstrates both their value to the community and Hubble science, and the relevance and uniqueness of Hubble’s outstanding capabilities in complementing JWST and Roman, and laying a path toward HWO.

Cycle 35 Dates

We anticipate that the Cycle 35 Call for Proposals will be released on December 16, 2026 and that the Cycle 35 Phase I deadline will be on Thursday April 1, 2027. The review panels will take place June 7 to 10 and 14 to 16, 2027. Cycle 35 will run November 1, 2027 through October 31, 2028.

During Cycle 34 we used a template modification checker. The overarching goal is to ensure a level playing field where all proposers (and proposals) access equal resources (i.e., words). We suspect that many issues we saw this cycle were accidental, likely the result of importing extra LaTeX packages with unintended, and unnoticed, side effects. We remind proposers that they should not make deliberate changes to the templates, and check carefully for any inadvertent side effects from imported LaTeX packages. Proposers should also take care to use the version of the template specific to the cycle, even for resubmissions. We anticipate making the template-checking tool available to the community for Cycle 35 so that proposers may check their proposals for compliance before submission.

Serve on the TACs

STScI runs two TACs each year, one for HST (typically in the April to July timeframe) and one for JWST (typically in the November to February timeframe). We know they require a lot of work from the community, and that you have many other commitments and demands on your time. We very much appreciate all who consider our invitations to serve. We cannot run these reviews without your expertise and support, and we are incredibly grateful for the time and energy committed by so many to making these reviews a success.

Anyone interested in serving on a TAC panel, either as a Discussion panelist or an External panelist, may fill out the TAC Volunteer Form to be considered. Typically, postdocs with at least two years of experience and those more senior are eligible, but in exceptional cases, more junior researchers may be considered.

Users Committees

The Hubble Space Telescope User Committee (STUC) is responsible for advising STScI and the HST Project on all aspects of observatory operations. Membership for the STUC is drawn from the U.S. and ESA communities. Membership lasts for three years, and the committees meet twice a year, typically in the spring and fall, with additional communications as needed. The next STUC meeting is in mid-November.

We encourage users to reach out to current STUC members with any feedback ahead of the next meeting. Further information, including presentations from past meetings, reports from the committees, current committee members, and contact forms, are on STUC web page.

Serve on the Space Telescope Users Committee (STUC)

Would you like to serve on the STUC? We welcome nominations for STUC membership at any time by email: stuc-nominations@stsci.edu. Self-nominations are permitted but not required. Submissions are encouraged, but not required to include a brief cover letter and curriculum vitae summarizing the nominee’s relevant background and HST-related interests. While members must be affiliated with institutions in the U.S. or ESA countries, there is no restriction on citizenship. Nominations are considered on a rolling basis, as several members rotate off after every meeting, approximately every 6 months.

There is an equivalent JWST User Committee (JSTUC) whose members are drawn from the U.S., ESA, and CSA communities. Nominations may be submitted to jstuc-nominations@stsci.edu. The next JSTUC meeting is in early December.

Acknowledgements

We are extremely grateful to everyone who was involved in this process at every stage. It takes an enormous amount of time and energy from a huge number of people to see the review from start to finish.

First and foremost, we thank the Hubble TAC Chair, Panel Chairs, Panel Vice Chairs, At-Large members, Discussion panelists, and External panelists for their service on the Hubble Cycle 34 TAC.

View a List of the Cycle 34 Panelists

The overall TAC process was managed by Claus Leitherer, Molly Peeples, and Laura Watkins. The TAC logistics were coordinated by Aleksandra Hamanowicz. In addition, numerous STScI personnel supported the successful completion of the review process:

  • Technical Manager: Aleksandra Hamanowicz received, organized, and distributed the proposals, oversaw the proposal database, and announced the results. Amber Armstrong provided additional technical support.
  • Science Policy: Daniel D’Orazio, Amy Jones, Claus Leitherer, Molly Peeples, and Laura Watkins were responsible for panelist selection, assigning proposals for review based on expertise while avoiding conflicts of interest, managing the panels, and coordinating and processing the reviews. Mercedes López-Morales and Neill Reid assisted with policy coordination, and oversight before and during the panel meeting. Josh Lothringer, Nikolay Nikolov, and Linda Smith provided additional policy support during the panel meetings. Paz Martinez, Nikolay Nikolov, and Lou Strolger provided additional data analysis support for the TAC process.
  • WASABI Support: Doug Paul, Matej Bludsky, Jeff Bucklew, Aasif Chanandin, Alex Framarini, Craig Hollinshead, Lauretta Nagel, and Daniel Thompson
  • AV Support: Kevin Flinn and Gary Gilbert
  • Panel Support: Gagandeep Anand, Amber Armstrong, Tri Astraatmadja, Paul Bennet, Benjamin Gibson, Avery Kim, Mariarosa Marinelli, Annabella Meech, Sapna Mishra, and Britney Whittington
  • Instrument and Telescope Support: Roberto Avila, John Debes, Travis Fisher, Elaine Frazer, Svea Hernandez, Matilde Mingozzi, Amanda Pagul, Jenna Ryon, Matt Siebert, and Dave Stark
  • Planning and Scheduling and Coordination Support: Vanshree Bhalotia, James Caplinger, Alison Vick, Ian Jordan, Fawn Brewer, Kristen Wymer, William Workman III, and William Januszewski
  • ESA Observers: Chris Evans and Paule Sonnentrucker
  • HSTMO Observers: Joleen Carlberg, Marc Rafelski, and Julia Roman-Duval
  • NASA’s Goddard Space Flight Center and HQ Observers: Ken Carpenter, Doris Daou, Andrew Ptak, and Jennifer Wiseman

Share This Page

This site is protected by reCAPTCHA and the Google

Contact our News Team