STIS Cycle-19 Calibration Phase-1 Template Last Revised: 01/08/2011 Proposal ID: 12767 Title: STIS CCD Imaging Flat-field Monitor PI: Elena Mason Co-I(s): Charles Proffitt --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-19. Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 8 Comments on orbit estimate: _ 8 orbits for 50CCD and F28X50LP spread across the cycle: one orbit every 47 days; --------------------------------------------------------------------------- # This section should be written with a GO audience in mind -- use # Calibration plans in WFPC-2 handbook as a guide. Purpose: Monitor the IMG flat field stability (and the evolution of possible filter and/or detector defects) across the cycle. Description: Once every seven weeks, obtain a series of imaging CCD flats using the MIRROR with the unfiltered 50CCD aperture and the filtered F28X50LP aperture. These will be used to monitor the characteristics of the CCD response, and to look for the development of new cosmetic defects. The program is a continuation of cycle 18 program 12406 and identical to it, with the exception of the 2 50CORON flats which have now been removed. Accuracy: Comments on Accuracy: Products: Being it just a monitoring program, no products are foreseen. --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: Obtain, every ~1.5 months, two sets of 5 STIS CCD flats, each. The first set will be taken with the 50CCD aperture and MIRROR, the second flat will be taken with F28x50LP and MIRROR. In both case the lamp in use will be the tungsten one. These flats will be used to monitor the flat field stability across the cycle. # Target information (copy for each target) Target Name.............................: Tungsten Flux (and units)........................: Internal Tungsten Lamp Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: Tungsten Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: MIRROR Aperture................................: 50CCD Central Wavelength......................: n/a Exposure Time...........................: 0.3s, crsplit=no Number of Iterations ...................: 6 ETC PID IDs for Count Rates.............: n/a Special Requirements or options.........: GAIN=4 Comments: monitoring, every ~1.5 month Target or lamp..........................: Tungsten Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: MIRROR Aperture................................: F28X50LP Central Wavelength......................: n/a Exposure Time...........................: 0.3s, crsplit=no Number of Iterations ...................: 5 ETC PID IDs for Count Rates.............: n/a Special Requirements or options.........: GAIN=4 Comments: monitoring, monthly --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: The 50CCD and F28X50LP flats should be taken every ~1.5 month monthly (together in one orbit) throughout cycle 19. Prerequisites: n/a PDB update? n/a On-board table update? n/a # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: ------------------------------------------------------------------------- # Link to Cycle 19 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 53% of STIS total exposure time. List categories of science which can't be executed until after this proposal: None why: List categories of science which are best performed contemporaneous with this proposal: None why: --------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 0.5/month Required turnaround on analysis (weeks): < 1/month Data volume (Mb needed for analysis): 500 Special software needed for analysis? (Describe): None Description of analysis Plans: We will obtain the flats and monitor both their variations and the development of any cosmetic defects.