STIS Cycle-19 Calibration Phase-1 Last Revised: July 20, 2011 Proposal ID: 12771 Title: Slit Wheel Repeatability PI: Chris Long Co-I(s): M. Wolfe, R. Osten, C. Proffitt --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-19; assume 52 weeks) Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 1 Comments on orbit estimate: --------------------------------------------------------------------------- Purpose: Test the repeatibility of the slit wheel by taking a sequence of comparison lamp spectra with grating G230MB (2697) and the three smallest long slits (52X0.2, 52X0.1, and 52X0.05). This is a clone of Cycle 18 Program 12410. Description: Verify the repeatability of the slit wheel for three STIS slits (52X0.2, 52X0.1, and 52X0.05) by taking images with the Pt/Cr/Ne LINE lamp and the CCD detector. Use the G230MB (2697) grating with the CCD, and rotate the slit wheel among the 3 chosen slits. Detector: CCD Grating: G230MB (2697) Slits: 52x0.2, 52X0.1, 52X0.05 Grating A: 52X0.2 (10 seconds) Grating B: 52X0.1 (10 seconds) Grating C: 52X0.05 (20 seconds) Sequence: A-B-C-B-C-A-A-B-A-C-B-B-A-B-C-B-C-C-A-B-A-C-B-A Forward motion: B - 4 times C - 6 times Backward motion: A - 6 times B - 4 times No motion: A/B/C - 1 time. Accuracy: 0.2 pixel Comments on Accuracy: after removing the zero-order shift Products: report --------------------------------------------------------------------------- # Link to Cycle 19 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 53% of STIS total exposure time. List categories of science which can't be executed until after this proposal: why: List categories of science which are best performed contemporaneous with this proposal: why: --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: Take spectra of LINE lamp at various slit positions. # Target information (copy for each target) Target Name.............................: LINE RA......................................: N/A Dec.....................................: N/A Flux (and units)........................: N/A Visibility window (if known or relevant): N/A Comment on choice of target: # Exposure list plan at the Phase I level. Be as complete as reasonable. # If possible information should be complete enough to allow easy # submission of a Phase 2 from this form. However, if you have to leave # some of the fields blank below, or want to provide the information # in another format, that is acceptable. (Make sure you do the BOP checking # though, as this is a phase-1 issue.) Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: e.g. Pt/Cr/Ne LINE Type of Acquisition.....................: e.g. N/A Detector for observation................: e.g. CCD Operating mode .........................: e.g. ACCUM Spectral Element........................: e.g. G230MB Aperture................................: e.g. 50x0.2, 50x0.1, 50x0.05 Central Wavelength......................: e.g. 2697 Exposure Time...........................: e.g. 10, 20s Number of Iterations ...................: e.g. 1 BOP Predicted Local Count Rate for MAMA.: N/A BOP Predicted Global Count Rate for MAMA: N/A ETC PID IDs for Count Rates.............: N/A Special Requirements or options.........: NON-INT Comments: perform once early in Cycle --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: early in Cycle 19 Prerequisites: None PDB update? None On-board table update? None # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: ------------------------------------------------------------------------- # Analysis Plan We will use the existing procedure (IRAF, IDL) developed during SM4 and Cycle 17 to analyze the data. Expected FTE weeks for analysis: 1 Required turnaround on analysis (weeks): 4 Data volume (Mb needed for analysis): 24 CCD images at 10.5 Mb each =252 Mb Special software needed for analysis? (Describe): Description of analysis Plans: After processing by calstis, we will use IRAF script "findshifts" to check any possible small shifts between the spectral features obtained with the same aperture and various wheel movements. Another IDL script fits the data points and remove a zero-order component of time variation. The residuals reflect the actual fluctuation of the wheel misalignment over observation time.