STIS Cycle-20 Calibration Phase-1 Template Last Revised: 31/08/2012 Proposal ID: 13136 Title: STIS CCD Imaging Flat-field Monitor PI: Elena Mason Co-I(s): Charles Proffitt --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-19. Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 4 Comments on orbit estimate: _ 4 orbits for 50CCD spread across the cycle. One short CORON exposure will be "attached" to each visit. --------------------------------------------------------------------------- # This section should be written with a GO audience in mind -- use # Calibration plans in WFPC-2 handbook as a guide. Purpose: Collect high SNR white light imaging flats (aperture=50CCD) for monitoring purposes and to create a new reference p-flat for chronographic (and imaging) observations. Description: Once every 3 months, obtain a series of imaging CCD flats using the MIRROR and the unfiltered 50CCD aperture. The 3 months cadence will allow us to keep monitoring possible (but unlikely) variations across the cycle; while the combined observations will allow us to obtain an average signal ~620000 ADU/pix (similarly to the past cycles) and create a high accuracy (~1%) imaging p-flat. The remaining time in each orbit/visit will be used to monitor the stability of the CORON aperture due to the MSM limited reproducibility. The program is a continuation of cycle 19 program 12767. However, with respect to cycle 19 program (and older) the number of visits has been halved. In addition, the set of exposures with the aperture F28X50LP has been dropped. They will be (partly) replaced with the aperture CORON in order to monitor the MSM reproducibility and test the possibility of producing a choronographic l-flat. Accuracy: ~1% Comments on Accuracy: Products: Reference p-flat and TIR or ISR as relevant. --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: # Target information (copy for each target) Target Name.............................: Tungsten Flux (and units)........................: Internal Tungsten Lamp Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: Tungsten Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: MIRROR Aperture................................: 50CCD Central Wavelength......................: n/a Exposure Time...........................: 0.3s, crsplit=no Number of Iterations ...................: 12 ETC PID IDs for Count Rates.............: n/a Special Requirements or options.........: GAIN=4 Comments: monitoring, every ~3 months Target or lamp..........................: Tungsten Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: MIRROR Aperture................................: 50CORNO Central Wavelength......................: n/a Exposure Time...........................: 0.3s, crsplit=no Number of Iterations ...................: 1 ETC PID IDs for Count Rates.............: n/a Special Requirements or options.........: GAIN=4 Comments: monitoring, every ~3 months --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: 1 orbit every 3 months. Prerequisites: n/a PDB update? n/a On-board table update? n/a # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: ------------------------------------------------------------------------- # Link to Cycle 19 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 5% of STIS total exposure time. List categories of science which can't be executed until after this proposal: None why: List categories of science which are best performed contemporaneous with this proposal: None why: --------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 4 Required turnaround on analysis (weeks): 4 Data volume (Mb needed for analysis): ~750M Special software needed for analysis? (Describe): TBD Description of analysis Plans: Monitor the 50CDD flat stability across the cycle + combine current and past cycle images (as appropriate) to create a new (real) reference p-flat. Evaluate the possibility of creating an l-flat or "super flat" for the CORON observations, depending on the MSM reproducibility.