STIS Cycle-21 Calibration Phase-1 Template Last Revised: 19/09/2013 Proposal ID: 13539 Title: STIS CCD Imaging Flat-field Monitor PI: Hugues Sana Co-I(s): Stephen Holland, Charles Proffitt --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-21. Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 4 Comments on orbit estimate: _ 4 orbits for 50CCD spread across the cycle. One short CORON exposure will be "attached" to each visit. --------------------------------------------------------------------------- # This section should be written with a GO audience in mind -- use # Calibration plans in WFPC-2 handbook as a guide. Purpose: Collect high SNR white light imaging flats (aperture=50CCD) for monitoring purposes and to create a new reference p-flat for chronographic (and imaging) observations. Description: Once every 3 months, obtain a series of imaging CCD flats using the MIRROR and the unfiltered 50CCD aperture. The 3 months cadence will allow us to keep monitoring possible (but unlikely) variations across the cycle; while the combined observations will allow us to obtain an average signal ~620000 ADU/pix (similarly to the past cycles) and create a high accuracy (~1%) imaging p-flat. The remaining time in each orbit/visit will be used to monitor the stability of the CORON aperture due to the MSM limited reproducibility. Accuracy: ~1% Comments on Accuracy: Products: Reference p-flat and TIR or ISR as relevant. --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: # Target information (copy for each target) Target Name.............................: Tungsten Flux (and units)........................: Internal Tungsten Lamp Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: Tungsten Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: MIRROR Aperture................................: 50CCD Central Wavelength......................: n/a Exposure Time...........................: 0.3s, crsplit=no Number of Iterations ...................: 12 ETC PID IDs for Count Rates.............: n/a Special Requirements or options.........: GAIN=4 Comments: monitoring, every ~3 months Target or lamp..........................: Tungsten Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: MIRROR Aperture................................: 50CORNO Central Wavelength......................: n/a Exposure Time...........................: 0.3s, crsplit=no Number of Iterations ...................: 1 ETC PID IDs for Count Rates.............: n/a Special Requirements or options.........: GAIN=4 Comments: monitoring, every ~3 months --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: 1 orbit every 3 months. Prerequisites: n/a PDB update? n/a On-board table update? n/a # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: ------------------------------------------------------------------------- # Link to Cycle 21 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 20% of STIS total exposure time. List categories of science which can't be executed until after this proposal: None why: List categories of science which are best performed contemporaneous with this proposal: None why: --------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 4 Required turnaround on analysis (weeks): 4 Data volume (Mb needed for analysis): ~750M Special software needed for analysis? (Describe): TBD Description of analysis Plans: Monitor the 50CDD flat stability across the cycle + combine current and past cycle images (as appropriate) to create a new (real) reference p-flat. Evaluate the possibility of creating an l-flat or "super flat" for the CORON observations, depending on the MSM reproducibility.