STIS Cycle-24 Calibration Phase-1 Last Revised: 20 May 2016 Proposal ID: TBD (cycle 23: 14431) Title: STIS NUV MAMA Dark Monitor PI: Sean Lockwood Co-I(s): --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-24; assume 52 weeks) Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 52 Comments on orbit estimate: 2-orbit visits repeated every 2 weeks --------------------------------------------------------------------------- Purpose: Monitor the behavior of the dark current in the NUV MAMA detector Provides data for dark count corrections for faint object observations Also provide a check on the health of the detector Description: Every two weeks two 1300 second dark exposures are taken separated by six hours within an SAA free period. This separates long and short term temporal effects. Accuracy: 1% Comments on Accuracy: Statistical accuracy on mean dark rate. Products: Dark reference files and tables modeling time and temperature dependence of dark rates. Update to monitoring webpage. --------------------------------------------------------------------------- # Link to Cycle 24 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 40% (cycle 23) --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: Take dark exposures in consecutive orbits to measure dark rate vs date and NUV MAMA on-time. # Target information Target Name.............................: DARK RA......................................: Dec.....................................: Flux (and units)........................: Visibility window (if known or relevant): SAA free orbits Comment on choice of target: # Exposure list plan at the Phase I level. Be as complete as reasonable. # If possible information should be complete enough to allow easy # submission of a Phase 2 from this form. However, if you have to leave # some of the fields blank below, or want to provide the information # in another format, that is acceptable. (Make sure you do the BOP checking # though, as this is a phase-1 issue.) Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: DARK Type of Acquisition.....................: None Detector for observation................: STIS/NUV-MAMA Operating mode .........................: TIMETAG Spectral Element........................: DEF Aperture................................: DEF Central Wavelength......................: Exposure Time...........................: 1300 s Number of Iterations ...................: 2 BOP Predicted Local Count Rate for MAMA.: BOP Predicted Global Count Rate for MAMA: ETC PID IDs for Count Rates.............: Special Requirements or options.........: SAA free Comments: --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: Visits spaced apart every 2 weeks; SAA free. A1: BETWEEN Oct 30, 2016 00:00:00 AND Nov 06, 2016 23:59:59 B1: BETWEEN Nov 13, 2016 00:00:00 AND Nov 20, 2016 23:59:59 C1: BETWEEN Nov 27, 2016 00:00:00 AND Dec 04, 2016 23:59:59 D1: BETWEEN Dec 11, 2016 00:00:00 AND Dec 18, 2016 23:59:59 E1: BETWEEN Dec 25, 2016 00:00:00 AND Jan 01, 2017 23:59:59 F1: BETWEEN Jan 08, 2017 00:00:00 AND Jan 15, 2017 23:59:59 G1: BETWEEN Jan 22, 2017 00:00:00 AND Jan 29, 2017 23:59:59 H1: BETWEEN Feb 05, 2017 00:00:00 AND Feb 12, 2017 23:59:59 I1: BETWEEN Feb 19, 2017 00:00:00 AND Feb 26, 2017 23:59:59 J1: BETWEEN Mar 05, 2017 00:00:00 AND Mar 12, 2017 23:59:59 K1: BETWEEN Mar 19, 2017 00:00:00 AND Mar 26, 2017 23:59:59 L1: BETWEEN Apr 02, 2017 00:00:00 AND Apr 09, 2017 23:59:59 M1: BETWEEN Apr 16, 2017 00:00:00 AND Apr 23, 2017 23:59:59 N1: BETWEEN Apr 30, 2017 00:00:00 AND May 07, 2017 23:59:59 O1: BETWEEN May 14, 2017 00:00:00 AND May 21, 2017 23:59:59 P1: BETWEEN May 28, 2017 00:00:00 AND Jun 04, 2017 23:59:59 Q1: BETWEEN Jun 11, 2017 00:00:00 AND Jun 18, 2017 23:59:59 R1: BETWEEN Jun 25, 2017 00:00:00 AND Jul 02, 2017 23:59:59 S1: BETWEEN Jul 09, 2017 00:00:00 AND Jul 16, 2017 23:59:59 T1: BETWEEN Jul 23, 2017 00:00:00 AND Jul 30, 2017 23:59:59 U1: BETWEEN Aug 06, 2017 00:00:00 AND Aug 13, 2017 23:59:59 V1: BETWEEN Aug 20, 2017 00:00:00 AND Aug 27, 2017 23:59:59 W1: BETWEEN Sep 03, 2017 00:00:00 AND Sep 10, 2017 23:59:59 X1: BETWEEN Sep 17, 2017 00:00:00 AND Sep 24, 2017 23:59:59 Y1: BETWEEN Oct 01, 2017 00:00:00 AND Oct 08, 2017 23:59:59 Z1: BETWEEN Oct 15, 2017 00:00:00 AND Oct 22, 2017 23:59:59 ?2: AFTER ?1 BY 3.0 Orbits TO 4.0 Orbits # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: ------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 2 Required turnaround on analysis (weeks): 2 for each measurement Data volume (Mb needed for analysis): 0 Special software needed for analysis? (Describe): Python programs already written and used in cycle 20 Description of analysis Plans: Continue with plan established in cycle 20. Software is already functional. Analyze dark rate as a function of time and temperature.