STIS Cycle-25 Calibration Phase-1 Template Last Revised: Sept 18, 2017 Proposal ID: Title: STIS E140M Sensitivity Curves PI: TalaWanda Monroe Co-I(s): --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-25; assume 52 weeks) Total Prime Orbits: 1 External Parallel Orbits: 0 Internals or no-impact orbits: 0 Comments on orbit estimate: (e.g. 4 orbit visits, repeated monthly) --------------------------------------------------------------------------- # This section should be written with a GO audience in mind -- use # Calibration plans in WFPC-2 handbook as a guide. Purpose: To derive a new set of sensitivity curves for the E140M grating from new observations of the DA white dwarf G191-B2B. This will allow better relative flux agreement between overlapping regions of adjacent orders. Description: The spectrophotometric white dwarf G191-B2B will be observed with the E140M grating to obtain an updated set of sensitivity curves for this highly used mode. Spectroscopic sensitivity monitoring observations of BD+284211 have shown that the blaze function shapes have changed since SM4 and now limit the relative photometric flux accuracy of ~14 of 43 E140M spectral orders to 5-10% at the edges. The blaze function shape changes have hindered attempts to determine the post-SM4 temporal blaze function shifts for this grating. Given the popularity of this unique FUV mode, with almost full simultaneous coverage of 1144 to 1710 A in a single observation, and consideration of STIS’s archival legacy, we request 1 orbit to re-observe G191-B2B with the E140/1425 setting. Accuracy: ~1%, peak S/N ~ 90 per resel Comments on Accuracy: Total one sigma absolute and relative flux calibration of 5% is desired per the STIS IHB. The SNRs of the edge orders will be ~ 25 per resel, assuring a relative flux accuracy of ~4%. Products: Updated PHOTTAB and RIPTAB reference files and ISR. Possible extraction of edge order 86, which was excluded from previous post-SM4 reference files. --------------------------------------------------------------------------- # Link to Cycle 25 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 9% List categories of science which can't be executed until after this proposal: why: List categories of science which are best performed contemporaneous with this proposal: why: --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: (e.g. Take spectra of G191B2B at each supported central wavelength of each grating with the CCD and the 52x0.5 slit.) # Target information (copy for each target) Target Name.............................: G191-B2B RA......................................: 05:05:30.61284 Dec.....................................: +52:49:51.9556 Flux (and units)........................: Vmag = 11.781 Visibility window (if known or relevant): Comment on choice of target: HST Standard Star # Exposure list plan at the Phase I level. Be as complete as reasonable. # If possible information should be complete enough to allow easy # submission of a Phase 2 from this form. However, if you have to leave # some of the fields blank below, or want to provide the information # in another format, that is acceptable. (Make sure you do the BOP checking # though, as this is a phase-1 issue.) Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: G191B2B Type of Acquisition.....................: ACQ(F28X50LP, MIRROR, 0.2 S) ACQ-PEAK (0.2x0.2, MIRROR, 0.4 S) Detector for observation................: FUV-MAMA Operating mode .........................: ACCUM Spectral Element........................: E140M Aperture................................: 0.2x0.2 Central Wavelength......................: 1425 Exposure Time...........................: 2220 s Number of Iterations ...................: 1 BOP Predicted Local Count Rate for MAMA.: 0.652 BOP Predicted Global Count Rate for MAMA: 59,602.012 ETC PID IDs for Count Rates.............: STIS.sp.1014616 Special Requirements or options.........: SAA-free orbit Comments: (e.g. if monitoring, specify frequency) --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: SAA-free Prerequisites: PDB update? On-board table update? # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: ------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 6 Required turnaround on analysis (weeks): 6 Data volume (Mb needed for analysis): N/A Special software needed for analysis? (Describe): Description of analysis Plans: We will use existing scripts in the repository to extract new sensitivity curves and ripple table, following the analyis of Bostroem et al. (STIS ISR 2012-01).