STIS Cycle-30 Calibration Phase-1 Template Last Revised: May 3, 2022 Proposal ID: (previously 16550 in Cycle 29) Title: STIS CCD Spectroscopic Flats PI: Joleen Carlberg Co-I(s): -- --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-30 Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 19 Comments on orbit estimate: _ 9 orbits for G430M/5216/50CCD spread across the cycle _ 10 orbits for G430M/5216/52x2; --------------------------------------------------------------------------- # This section should be written with a GO audience in mind -- use # Calibration plans in WFPC-2 handbook as a guide. Purpose: Obtain medium resolution (MR) grating flats to determine the pixel-to-pixel variation for spectroscopic observations and produce the Cycle 30 reference p-flat (M and L modes). Description: We will use the tungsten lamp and the MR grating G430M to determine the pixel-to-pixel variation of the STIS CCD in spectroscopic mode. The flat exposures will be taken with the apertures 50CCD and 52x2 at 5 offset positions in order to map -with a sufficient SNR- the whole sensitive area of the detector. The expected cumulative signal is >=1.4E6 ADU/pixels; while the expected accuracy will be <=1.5%. Accuracy: <= 1.5% Comments on Accuracy: How well the spectroscopic science data can be flattened. Products: Reference files and ISR as applicable. ------------------------------------------------------------------------- # Link to Cycle 30 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 17.8% of total Cycle 29 STIS exposure time. List categories of science which can't be executed until after this proposal: None. List categories of science which are best performed contemporaneous with this proposal: High S/N CCD spectroscopy why: For programs that need very high S/N, it would be best if the epoch of the flats spans the observations. So the flat program should be spread out over the whole cycle. --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: # Target information (copy for each target) Target Name.............................:Tungsten Flux (and units)........................:Internal Tungsten Lamp Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: Tungsten lamp Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: G430M Aperture................................: 50CCD Central Wavelength......................: 5216 Exposure Time...........................: 21s, crsplit=no Number of Iterations ...................: 9 (X 9 visits) ETC PID IDs for Count Rates.............: Special Requirements or options.........: GAIN=4, Comments: One visit (9 flats) every ~40 days. Target or lamp..........................: Tungsten lamp Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: G430M Aperture................................: 52X2 Central Wavelength......................: 5216 Exposure Time...........................: 550s X 2, crsplit=no Number of Iterations ...................: 2 (X 10 visits; 1 slit-steps/visit and 5 slit-steps in total). ETC PID IDs for Count Rates.............: Special Requirements or options.........: GAIN=4, dither with special slit-pos pattern Comments: --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: 9 orbits with G430M/5612 and 50CCD -- 1 orbit every ~40 days Prerequisites: n/a PDB update? n/a On-board table update? n/a # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: --------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 2.5 Required turnaround on analysis (weeks): 2.5 Data volume (Mb needed for analysis): ~2.8G Special software needed for analysis? (Describe): existing IDL/Python scripts Description of analysis Plans: Do statistical analysis of data yearly to check for any significant changes in pixel-to-pixel flats. Co-add G430M flats after 8 weeks and then again at end of cycle to make new pfl files as needed.