STIS Cycle-30 Calibration Phase-1 Last Revised: May 19, 2022 Proposal ID: TBD Title: STIS NUV-MAMA Dark Monitor PI: Amy M Jones Co-I(s): --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-30; assume 52 weeks) Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 52 Comments on orbit estimate: 2-orbit visits repeated every 2 weeks --------------------------------------------------------------------------- # This section should be written with a GO audience in mind -- use # Calibration plans in WFPC-2 handbook as a guide. Purpose: Monitor the behavior of the dark current in the NUV-MAMA detector. Provides data for dark count corrections for faint object observations. Also provide a check on the health of the detector Description: Every two weeks, two 1300 second NUV-MAMA dark exposures will be taken separated by six hours within an SAA free period. This separates long and short term temporal effects. Accuracy: 1% Comments on Accuracy: Statistical accuracy on mean dark rate. Products: Dark reference files and tables modeling time and temperature dependence of dark rates. Update to monitoring webpage. --------------------------------------------------------------------------- # Link to Cycle 30 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 35.8% (Cycle 29) List categories of science which can't be executed until after this proposal: why: List categories of science which are best performed contemporaneously with this proposal: why: --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: (e.g. Take spectra of G191B2B at each supported central wavelength of each grating with the CCD and the 52x0.5 slit.) # Target information (copy for each target) Target Name.............................: DARK RA......................................: Dec.....................................: Flux (and units)........................: Visibility window (if known or relevant): SAA free orbits Comment on choice of target: # Exposure list plan at the Phase I level. Be as complete as reasonable. # If possible information should be complete enough to allow easy # submission of a Phase 2 from this form. However, if you have to leave # some of the fields blank below, or want to provide the information # in another format, that is acceptable. (Make sure you do the BOP checking # though, as this is a phase-1 issue.) Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: Dark Type of Acquisition.....................: N/A Detector for observation................: STIS/NUV-MAMA Operating mode .........................: TIMETAG Spectral Element........................: DEF Aperture................................: DEF Central Wavelength......................: Exposure Time...........................: 1300 sec Number of Iterations ...................: 2 BOP Predicted Local Count Rate for MAMA.: BOP Predicted Global Count Rate for MAMA: ETC PID IDs for Count Rates.............: N/A Special Requirements or options.........: SAA free, BUFFER-TIME=650 Comments: --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: Visits spaced apart every 2 weeks; SAA free. A1: BETWEEN 2022-11-07 00:00:00 AND 2022-11-13 23:59:59 B1: BETWEEN 2022-11-21 00:00:00 AND 2022-11-27 23:59:59 C1: BETWEEN 2022-12-05 00:00:00 AND 2022-12-11 23:59:59 D1: BETWEEN 2022-12-19 00:00:00 AND 2022-12-25 23:59:59 E1: BETWEEN 2023-01-02 00:00:00 AND 2023-01-08 23:59:59 F1: BETWEEN 2023-01-16 00:00:00 AND 2023-01-22 23:59:59 G1: BETWEEN 2023-01-30 00:00:00 AND 2023-02-05 23:59:59 H1: BETWEEN 2023-02-13 00:00:00 AND 2023-02-19 23:59:59 I1: BETWEEN 2023-02-27 00:00:00 AND 2023-03-05 23:59:59 J1: BETWEEN 2023-03-13 00:00:00 AND 2023-03-19 23:59:59 K1: BETWEEN 2023-03-27 00:00:00 AND 2023-04-02 23:59:59 L1: BETWEEN 2023-04-10 00:00:00 AND 2023-04-16 23:59:59 M1: BETWEEN 2023-04-24 00:00:00 AND 2023-04-30 23:59:59 N1: BETWEEN 2023-05-08 00:00:00 AND 2023-05-14 23:59:59 O1: BETWEEN 2023-05-22 00:00:00 AND 2023-05-28 23:59:59 P1: BETWEEN 2023-06-05 00:00:00 AND 2023-06-11 23:59:59 Q1: BETWEEN 2023-06-19 00:00:00 AND 2023-06-25 23:59:59 R1: BETWEEN 2023-07-03 00:00:00 AND 2023-07-09 23:59:59 S1: BETWEEN 2023-07-17 00:00:00 AND 2023-07-23 23:59:59 T1: BETWEEN 2023-07-31 00:00:00 AND 2023-08-06 23:59:59 U1: BETWEEN 2023-08-14 00:00:00 AND 2023-08-20 23:59:59 V1: BETWEEN 2023-08-28 00:00:00 AND 2023-09-03 23:59:59 W1: BETWEEN 2023-09-11 00:00:00 AND 2023-09-17 23:59:59 X1: BETWEEN 2023-09-25 00:00:00 AND 2023-10-01 23:59:59 Y1: BETWEEN 2023-10-09 00:00:00 AND 2023-10-15 23:59:59 Z1: BETWEEN 2023-10-23 00:00:00 AND 2023-10-29 23:59:59 Prerequisites: (e.g., specific SMOV proposal; command development?) PDB update? (Specify table name if known e.g. SIAF). On-board table update? (Specify table name if known e.g. CCDBadPixelTable) # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: ------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 2 Required turnaround on analysis (weeks): 2 for each measurement Data volume (Mb needed for analysis): 0 Special software needed for analysis? (Describe): Python programs modified from those used in cycle 20 Description of analysis Plans: Continue with plan established in cycle 20. Software is already functional. Analyze dark rate as function of time and temperature.