STIS Cycle-32 Calibration Phase-1 Template Last Revised: May 22, 2025 Proposal ID: (previously 17635 in Cycle 32) Title: STIS CCD Spectroscopic Flats PI: Serge Dieterich Co-I(s): Mathew Dallas --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-33 Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 19 Comments on orbit estimate: 9 orbits for G430M/5216/50CCD spread across the cycle 10 orbits for G430M/5216/52x2; --------------------------------------------------------------------------- # This section should be written with a GO audience in mind -- use # Calibration plans in WFPC-2 handbook as a guide. Purpose: Obtain medium resolution (MR) grating flats to determine the pixel-to-pixel variation for CCD spectroscopic observations and if necessary, produce a new reference p-flat (M and L modes) from Cycle 33 data. Description: We will use the tungsten lamp and the MR grating G430M to determine the pixel-to-pixel variation of the STIS CCD in spectroscopic mode. In order to map the whole sensitive area of the detector with a sufficient SNR, 9 visits will be taken with the 50CCD aperture every 30-45 days and a single set of 10 visits spread evenly across 5 offset positions will be taken with the 52x2 aperture. The expected cumulative signal is >=1.4E6 ADU/pixels; while the expected accuracy will be <=1.5%. Accuracy: <= 1.5% Comments on Accuracy: How well the spectroscopic science data can be flattened. Products: P-flat reference files and summary in end of cycle calibration ISR. ------------------------------------------------------------------------- # Link to Cycle 33 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 11.5% of total Cycle 32 STIS exposure time. List categories of science which can't be executed until after this proposal: None. List categories of science which are best performed contemporaneous with this proposal: None why: --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: # Target information (copy for each target) Target Name.............................:Tungsten Flux (and units)........................:Internal Tungsten Lamp Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: Tungsten lamp Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: G430M Aperture................................: 50CCD Central Wavelength......................: 5216 Exposure Time...........................: 21s X 9, crsplit=no Number of Iterations ...................: 9 (X 9 visits) ETC PID IDs for Count Rates.............: Special Requirements or options.........: GAIN=4, Comments: One visit (9 flats) every ~40 days. Target or lamp..........................: Tungsten lamp Type of Acquisition.....................: n/a Detector for observation................: CCD Operating mode .........................: ACCUM Spectral Element........................: G430M Aperture................................: 52X2 Central Wavelength......................: 5216 Exposure Time...........................: 550s X 2, crsplit=no Number of Iterations ...................: 2 (X 10 visits; 1 slit-steps/visit and 5 slit-steps in total). ETC PID IDs for Count Rates.............: Special Requirements or options.........: GAIN=4, dither with special slit-pos pattern Comments: --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: 9 orbits with G430M/5612 and 50CCD -- 1 orbit every ~40 days Prerequisites: n/a PDB update? n/a On-board table update? n/a # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: --------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 2.0 Required turnaround on analysis (weeks): Continuous Data volume (Mb needed for analysis): ~2.8G Special software needed for analysis? (Describe): existing IDL/Python scripts Description of analysis Plans: Do statistical analysis of data yearly to check for any significant changes in pixel-to-pixel flats. Co-add G430M flats after 8 weeks and then again at end of cycle to make new pfl files as needed.