STIS Cycle-33 Calibration Phase-1 Last Revised: 23 May 2025 Proposal ID: TBD (Cycle 32: 17646) Title: STIS FUV MAMA Dark Monitor PI: Sean Lockwood Co-I(s): Jacqueline Brown --------------------------------------------------------------------------- # Orbit estimates are TOTAL for all of cycle-33; assume 52 weeks Total Prime Orbits: 0 External Parallel Orbits: 0 Internals or no-impact orbits: 48 Comments on orbit estimate: 6-orbit sets of visits repeated every 6 weeks --------------------------------------------------------------------------- Purpose: Monitor the behavior of the dark current in the FUV-MAMA detector. Provides data for dark count corrections for faint object observations. Also provide a check on the health of the detector. Description: Every six weeks, a set of six exposures of 1300 s is taken with the FUV-MAMA with the light path blocked. The exposures are evenly spread over a six-hour SAA-free period. Accuracy: 1% Comments on Accuracy: Statistical error on the total number of counts in an image Products: Dark current images and temperature-dependent formula for applying to an individual observation. Update to monitoring webpage. DQ flags in pipeline super-darks. --------------------------------------------------------------------------- # Link to Cycle 33 Science # Use the GO + GTO Phase 1 exposure listing and derived statistics # posted on WWW. Fraction of science programs supported by this calibration: 59.7% of STIS total exposure time (cycle 32) List categories of science which can't be executed until after this proposal: None why: List categories of science which are best performed contemporaneously with this proposal: None why: --------------------------------------------------------------------------- # THE REST OF THIS FORM IS FOR INTERNAL USE --------------------------------------------------------------------------- Observation summary: Take dark exposures in consecutive orbits to measure dark rate vs date and FUV MAMA on-time. # Target information Target Name.............................: DARK RA......................................: Dec.....................................: Flux (and units)........................: Visibility window (if known or relevant): SAA free orbits Comment on choice of target: # Exposure list plan at the Phase I level. Be as complete as reasonable. # If possible information should be complete enough to allow easy # submission of a Phase 2 from this form. However, if you have to leave # some of the fields blank below, or want to provide the information # in another format, that is acceptable. (Make sure you do the BOP checking # though, as this is a phase-1 issue.) Table of exposures (copy for each exposure as appropriate/desired): Target or lamp..........................: DARK Type of Acquisition.....................: None Detector for observation................: STIS/FUV-MAMA Operating mode .........................: TIMETAG Spectral Element........................: DEF Aperture................................: DEF Central Wavelength......................: Exposure Time...........................: 1300 s Number of Iterations ...................: 1 BOP Predicted Local Count Rate for MAMA.: BOP Predicted Global Count Rate for MAMA: ETC PID IDs for Count Rates.............: Special Requirements or options.........: SAA free BUFFER-TIME=650 Comments: --------------------------------------------------------------------------- # Special needs of this proposal? Scheduling: Groups of visits spaced apart ~every 6 weeks; SAA free. A1: BETWEEN 2025-12-08 00:00:00 AND 2025-12-14 23:59:59 B1: BETWEEN 2026-01-19 00:00:00 AND 2026-01-25 23:59:59 C1: BETWEEN 2026-03-02 00:00:00 AND 2026-03-08 23:59:59 D1: BETWEEN 2026-04-13 00:00:00 AND 2026-04-19 23:59:59 E1: BETWEEN 2026-05-25 00:00:00 AND 2026-05-31 23:59:59 F1: BETWEEN 2026-07-06 00:00:00 AND 2026-07-12 23:59:59 G1: BETWEEN 2026-08-17 00:00:00 AND 2026-08-23 23:59:59 H1: BETWEEN 2026-09-28 00:00:00 AND 2026-10-04 23:59:59 A2-A6: AFTER A1 BY [1.1 TO 1.43, 2.3 TO 2.6, 3.5 TO 3.8, 4.7 TO 5.0, 5.9 TO 6.2] H B2-B6: AFTER B1 BY [1.1 TO 1.43, 2.3 TO 2.6, 3.5 TO 3.8, 4.7 TO 5.0, 5.9 TO 6.2] H C2-C6: AFTER C1 BY [1.1 TO 1.43, 2.3 TO 2.6, 3.5 TO 3.8, 4.7 TO 5.0, 5.9 TO 6.2] H D2-D6: AFTER D1 BY [1.1 TO 1.43, 2.3 TO 2.6, 3.5 TO 3.8, 4.7 TO 5.0, 5.9 TO 6.2] H E2-E6: AFTER E1 BY [1.1 TO 1.43, 2.3 TO 2.6, 3.5 TO 3.8, 4.7 TO 5.0, 5.9 TO 6.2] H F2-F6: AFTER F1 BY [1.1 TO 1.43, 2.3 TO 2.6, 3.5 TO 3.8, 4.7 TO 5.0, 5.9 TO 6.2] H G2-G6: AFTER G1 BY [1.1 TO 1.43, 2.3 TO 2.6, 3.5 TO 3.8, 4.7 TO 5.0, 5.9 TO 6.2] H H2-H6: AFTER H1 BY [1.1 TO 1.43, 2.3 TO 2.6, 3.5 TO 3.8, 4.7 TO 5.0, 5.9 TO 6.2] H Prerequisites: (e.g., specific SMOV proposal; command development?) PDB update? N On-board table update? N # Special Requirements: Real time? N Special commanding? N Quick Data turnaround? N Special timing required? N Other? N Describe (& justify) special requirements: n/a ------------------------------------------------------------------------- # Analysis Plan Expected FTE weeks for analysis: 2 Required turnaround on analysis (weeks): 2 for each measurement Data volume (MB needed for analysis): 0 Special software needed for analysis? (Describe): Monitoring Python programs in place Description of analysis Plans: Continue with plan established in cycle 20. Monitoring software is already functional. Model dark rate as a function of time and temperature. Produce post-SM4 DARKFILEs, DQ-flagging hot pixels