TV2 testing used a backup UVIS detector (build 2), and a backup IR detector (FPA129).

UVIS

ISR 2009-01: The ground calibrations of the WFC3/UVIS G280 grism
H. Kuntschner, H. Bushouse, M. Kummel, and J. R. Walsh 22 Jan 2009

ISR 2007-27: WFC3 TV2 Testing: UVIS-2 Read Noise
A. R. Martel, S. Baggett 29 Nov 2007

ISR 2007-26: WFC3 TV2 Testing: UVIS-2 Dark Frames and Rates
A. R. Martel 02 Nov 2007

ISR 2007-24: WFC3 TV2 Testing: UVIS Filtered Throughput
T. Brown 26 Oct 2007

ISR 2007-22: WFC3 TV2 Testing: UVIS-2 Amp B Anomaly
S. Baggett, A. Waczynski 19 Oct 2007

ISR 2007-21: WFC3 TV2 Testing: UVIS Channel Glint
T. Brown 17 Oct 2007

ISR 2007-20: WFC3 TV2 Testing: System Throughput on the UVIS Build 2 Detector
T. Brown 11 Oct 2007

ISR 2007-19: WFC3 TV2 Testing: UVIS-2 Gain Results
S. Baggett 14 Sep 2007

ISR 2007-18: WFC3 TV2 Testing: Image Stability
T. Brown 28 Aug 2007

ISR 2007-17: WFC3 TV2 Testing: UVIS Shutter Stability and Accuracy
B. Hilbert 16 Aug 2007

ISR 2007-15: WFC3 Ambient-2 Testing: UVIS Readnoise
S. Baggett 16 May 2007

ISR 2007-14: WFC3 Ambient-2 Testing: Calibration Subsystem Performance
S. Baggett 07 May 2007

ISR 2007-13: UVIS CCD EPER CTE measurements performed during the April 2007 Ambient Calibration campaign (SMS UV02S01)
M. Robberto 30 Apr 2007

ISR 2007-11: WFC3 Ambient-2 Testing: UVIS Gain Results
S. Baggett 27 Apr 2007

ISR 2007-10: WFC3 Ambient Testing: UVIS Dark Current Rate
B. Hilbert 26 Apr 2007

ISR 2007-09: UVIS Channel Filter Ghosts after Filter Replacement
T. Brown 25 Apr 2007

ISR 2007-08: Searching for Scattered Light on the WFC3 UVIS Build 2 Detector
T. Brown 24 Apr 2007

ISR 2007-07: WFC3 System Throughput on the UVIS Build 2 Detector
T. Brown 19 Apr 2007

ISR 2007-05: WFC3 Science Calibration Plan. Part 6: Thermal-Vacuum #2 Test Procedures
H. Bushouse 01 Apr 2007

IR

ISR 2008-20: Thermal Vacuum 2: measures of the IR background and on-orbit predictions (SMS IR01S08)
M. Robberto 16 Jul 2008

ISR 2008-19: WFC3 TV2 Testing: IR Intrapixel sensitivity
P. McCullough 16 Jul 2008

ISR 2008-15: The TV2 ground calibrations of the WFC3 NIR grisms
H. Kuntschner, H. Bushouse, J. R. Walsh, M. Kummel 13 Jul 2008

ISR 2008-04: WFC3 TV2 Testing: IR Channel Read Noise
B. Hilbert 22 Feb 2008

ISR 2008-03: WFC3 TV2 Testing: IR Channel Dark Current
B. Hilbert 29 Jan 2008

ISR 2008-01: WFC3 TV2 Testing: Calibration Subsystem Performance
S. Baggett 11 Jan 2008

ISR 2007-28: WFC3 TV2 Testing: IR Gain Results
B. Hilbert 05 Dec 2007

ISR 2007-25: WFC3 TV2 Testing: IR Channel Non-linearity Correction and Unstable Pixel Masking
B. Hilbert 01 Nov 2007

ISR 2007-23: WFC3 TV2 Testing: IR Channel Throughput
T. Brown 23 Oct 2007

ISR 2007-18: WFC3 TV2 Testing: Image Stability
T. Brown 28 Aug 2007

ISR 2007-16: WFC3 TV2 Testing: IR Channel Ghosts and Baffle Scatter
T. Brown 15 Aug 2007

ISR 2007-14: WFC3 Ambient-2 Testing: Calibration Subsystem Performance
S. Baggett 07 May 2007

ISR 2007-05: WFC3 Science Calibration Plan. Part 6: Thermal-Vacuum #2 Test Procedures
H. Bushouse 01 Apr 2007

Last Updated: 06/02/2023

Pre-footer

HST Help Desk 

Please contact the HST Help Desk with any questions.