Time Allocation Change History for 7492

Date Change Type Time Delta (hours) Reason
May 23, 2026 OVERHEAD_CHANGE 0.2 APT 2026.3.1
Mar 4, 2026 STSCI_RECOMMENDATION 0.7 Slightly over the allocation because PI followed the instructions of the instrument reviewer and increased the S/N of the TA integrations.
Nov 22, 2025 OVERHEAD_CHANGE 0.4 APT 2025.7.1
Aug 23, 2025 OVERHEAD_CHANGE 0.1 APT 2025.5.2
May 16, 2025 OVERHEAD_CHANGE 0.1 APT 2025.3.3