General Observer Programs in Cycle 3

The proposals listed below establish the program for JWST’s third year of science operations. Approximately 5,500 hours of prime time and up to 1,000 hours of parallel time — as well as 25 archival and 12 theory proposals — were awarded to observing programs in Cycle 3. STScI hosted the Cycle 3 Telescope Allocation Committee in January-February 2024. The meeting was held in three stages:

  • The smallest proposals (<15 hours duration) were distributed to 250 external reviewers who graded them independently;
  • The remaining small proposals (15 to 25 hours) and medium proposals (>25 to 75 hours) were reviewed by topical panels, meeting virtually from January 29th to February 2nd;
  • And the Large (>75 hours), Treasury and Legacy proposals were reviewed by the Executive Committee, comprising the topical panel chairs, at-large members, and the TAC Chair, who met in person at STScI from February 5th to 7th.

To view details about a specific program, select a category below, then click the Program ID.

NOTE: The listing of Co-PIs in the tables below has been limited to 4. Proposals with more than 4 Co-PIs are denoted with an asterisk. The full listing is available with the proposal.

Science Categories for GO Proposals

Abbreviations:

BOTS = Bright Object Time-series

FS = Fixed Slit

GTS = Grism Time Series

IFU = Integral Field Unit

LRS = Low Resolution Spectroscopy

MOS = Multi-object Spectroscopy

MRS = Medium Resolution Spectroscopy

SOSS = Single-object Slitless Spectroscopy

TSO = Time Series Observation

WFSS = Wide Field Slitless Spectroscopy

Pre-footer

This site is protected by reCAPTCHA and the Google

Webb Space Telescope insignia

 

For technical assistance, please contact the JWST Help Desk.

 

The NASA James Webb Space Telescope, developed in partnership with ESA and CSA, is operated by AURA’s Space Telescope Science Institute.